Olsen ODV-B Installation Instructions Manual Download Page 2

T

T

T

T

TABLE OF CONTENTS

ABLE OF CONTENTS

ABLE OF CONTENTS

ABLE OF CONTENTS

ABLE OF CONTENTS

HORIZONTAL PIPING .................................................................................. PAGES 1-10

WARNINGS ............................................................................................... PAGE 1
INSTALLATION .................................................................................... PAGES 2-3
TYPICAL INSTALLATION ......................................................................... PAGE 4
FLEX-L PIPING COMPONENTS ............................................................... PAGE 5
HEAT FAB PIPING COMPONENTS ........................................................... PAGE 6
Z-FLEX PIPING COMPONENTS ............................................................... PAGE 7
PROTECH PIPING COMPONENTS........................................................... PAGE 8
CONDENSATE DRAINS ............................................................................ PAGE 9
LOCATING THE VENT TERMINATION ................................................PAGES 9-10

VERTICAL VENT PIPING ........................................................................... PAGES 11-18

INSTALLATION .................................................................................. PAGE 11-16
B VENT SINGLE APPLIANCE ................................................................ PAGE 16
B VENT DUAL APPLIANCE ................................................................... PAGE 17
CATEGORY I VENT INSTALLATION....................................................... PAGE 18

Summary of Contents for ODV-B

Page 1: ...V V V V B B B B B GAS FIRED BOILERS FOR FORCED HOT WATER ECR International Ltd Olsen Division P O Box 900 Wallaceburg Ont N8A5E5 VENTING ADDENDUM VENTING ADDENDUM VENTING ADDENDUM VENTING ADDENDUM VE...

Page 2: ...NSTALLATION PAGE 4 FLEX L PIPING COMPONENTS PAGE 5 HEAT FAB PIPING COMPONENTS PAGE 6 Z FLEX PIPING COMPONENTS PAGE 7 PROTECH PIPING COMPONENTS PAGE 8 CONDENSATE DRAINS PAGE 9 LOCATING THE VENT TERMINA...

Page 3: ...F BOILERS AND ALL INSTALLATIONS OF BOILERS AND ALL INSTALLATIONS OF BOILERS AND ALL INSTALLATIONS OF BOILERS AND ALL INSTALLATIONS OF BOILERS AND VENTING SHOULD BE DONE ONLY BY A QUALIFIED EXPERT AND...

Page 4: ...ivalent to 15 feet of vent pipe w 2 elbows Note condensate trap is not required on models ODV150 thru 200 E The vent pipe should slope upward from the boiler at least 1 inch for every 4 feet F No port...

Page 5: ...PAGE 3 FIGURE1b FIGURE 2 FIGURE 3 FIGURE1a...

Page 6: ...PICAL INSTALLA ALLA ALLA ALLA ALLATION TION TION TION TION Notes 1 A condensate tee drain is only needed when horizontal vent lengths exceed 10 feet 2 Insert vent pipe in boiler venter outlet vent ada...

Page 7: ...nts Notes 1 A condensate tee drain is only needed when horizontal vent lengths exceed 10 feet 2 Insert vent pipe in boiler venter outlet vent adapter apply silicone completely around edge of outlet an...

Page 8: ...onents PAGE 6 FIGURE 6 Notes 1 A condensate tee drain is only needed when horizontal vent lengths exceed 10 feet 2 Insert vent pipe in boiler venter outlet vent adapter apply silicone completely aroun...

Page 9: ...ent Pipe Components Notes 1 A condensate tee drain is only needed when horizontal vent lengths exceed 10 feet 2 Insert vent pipe in boiler venter outlet vent adapter apply silicone completely around e...

Page 10: ...Vent Pipe Components Notes 1 A condensate tee drain is only needed when horizontal vent lengths exceed 10 feet 2 Insert vent pipe in boiler venter outlet vent adapter apply silicone completely around...

Page 11: ...ersinstructions J See the latest revision of the NFGC ANSI Z223 1 When installed in Canada The latest revision of the CAN CSA B149 Natural Gas and Propane Installtion Code FIGURE 9 CONDENSATE DRAINS C...

Page 12: ...PAGE 10 FIGURE10 NOTE IF THERE IS A POTENTIAL FOR EXCESSIVE WINDS SPECIAL CONSIDERATION SHOULD BE GIVEN TO LOCATE THE VENT TERMINATION AWAY FROM THE WINDWARD SIDE OF THE BUILDING...

Page 13: ...nting CATEGORY 1 Appliances have non positive vent static pressure and rely on the heat content of combustion products to vent You may common vent CATEGORY 1 boilers The boilers covered by this manual...

Page 14: ...e by locating boiler as close as practical to vent or chimney Avoid unnecessary turns or bends which create resistance to flow of vent gases Adding an elbow adds resistance For example adding a 6 90 d...

Page 15: ...1 clearance on all sides to reduce the possibility of condensate in vent Condensate may cause vent to deteriorate allowing combustion products to collect in structure which could result in injury or...

Page 16: ...t pipe must extend at least three feet above the point where it passes through the roof Vent termination must be at least two feet higher than any portion of building within ten feet horizontal andven...

Page 17: ...r foot To prevent sagging at each joint support vent connectors and horizontal portions using hangers straps or equivalent Seal all connections where vent connectors enter chimney See Figure 11 on pag...

Page 18: ...e National Fuel Gas Code ANSI Z223 1 NFPA54 In Canada CAN CSA B149 PAGE 16 FIGURE16 VER VER VER VER VERTICAL TICAL TICAL TICAL TICAL VENTING INST VENTING INST VENTING INST VENTING INST VENTING INSTALL...

Page 19: ...DRAFT TURAL DRAFT TURAL DRAFT TURAL DRAFT TURAL DRAFT W W W W WA A A A ATER HEA TER HEA TER HEA TER HEA TER HEATER 40 000 BTU HR TER 40 000 BTU HR TER 40 000 BTU HR TER 40 000 BTU HR TER 40 000 BTU HR...

Page 20: ...37616301 PAGE 18 REV 5 1 March 2004 FIGURE18...

Reviews: