
(1)
Unscrew and remove caps from 2 and 3-way valves.
(2)
Unscrew and remove cap from service valve.
(3)
Connect vacuum pump flexible hose to the service valve.
(4)
Start vacuum pump for 10-15 minutes until reaching a vacuum of 10 mm Hg absolutes.
(5)
With vacuum pump still running close the low pressure knob on vacuum pump manifold. Then stop
the vacuum pump.
(6)
Open 2-way valve ,1/4 turn, then close it after 10 seconds. Check tightness of all joints using liquid
soap or an electronic leak detector.
(7)
Turn 2 and 3-way valves stem to fully
open
the valves. Disconnect the flexible vacuum pump hose.
(8)
Replace and tighten all valve caps.
How to Purge Air Tubes:
Installation instructions
2
8
Summary of Contents for Premion Series
Page 3: ......
Page 4: ......
Page 5: ......
Page 6: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ...0...
Page 22: ...1...
Page 23: ...2...
Page 24: ...3...
Page 25: ...10 Hinano Running Husky Pro Energy Pro 4...
Page 26: ...OLMO...