Safety Precautions
Personnel Requirements
Only certified electricians are allowed to install, connect cables for, commission, maintain,
troubleshoot, and replace the BRE-I-5K14K.
⚫
Operation personnel should receive professional training.
⚫
Operation personnel should read through this document and follow all the precautions.
⚫
Operation personnel should be familiar with the safety specifications of the electrical
system.
⚫
Operation personnel should understand the composition and working principles of the
grid-tied PV system and local regulations.
⚫
Operation personnel must wear proper personal protective equipment (PPE).
Protect Labels
⚫
Do not scrawl or damage any labels on the BRE-I-5K14K enclosure because they
contain important information about the safe operation.
⚫
Do not scrawl or damage the nameplate on the BRE-I-5K14K enclosure because it
contains important product information.
Installation
Never operate the BRE-I-5K14K under power during installation.
⚫
Ensure that the BRE-I-5K14K is not connected to a power supply or powered on
before finishing the installation.
⚫
To allow proper heat dissipation and installation, maintain appropriate clearances
between the BRE-I-5K14K and other objects, as shown in Figure 1-1. If you have
any questions about the clearances, consult local technical support engineers.