INSTALLATION GUIDE
myolgoffice.com
Team Boardroom Table Twin Span
05
Optional
06
Loosely connect the shorter M8x12mm dome head bolt and slot nut through the
metal rail spacer bracket. Slide onto required rails and fully tighten in place.
Ensure the worksurface is centered over the frame. Pre-drill holes in the
worksurface. Fully tighten all M5x20mm self tapping screws through
each leg and rail spacer bracket into the
25mm
worksurface.
Conceal any power box cables using the magnetic leg cable covers.