background image

INSTALLATION GUIDE

myolgoffice.com

Team Boardroom Table Twin Span

05

Optional

06

Loosely connect the shorter M8x12mm dome head bolt and slot nut through the 
metal rail spacer bracket. Slide onto required rails and fully tighten in place. 

Ensure the worksurface is centered over the frame. Pre-drill holes in the 
worksurface. Fully tighten all M5x20mm self tapping screws through 
each leg and rail spacer bracket into the

 25mm

 worksurface.

Conceal any power box cables using the magnetic leg cable covers.

Reviews: