Chapter 9│ Maintenance
Fuse replacement
Fuse replacement should only be performed by qualified personnel
and power must be first switched off.
Fuses shall comply with IEC 60127 standard (time-delay fuse, low breaking
capacity, 250Vac). Please see
Oldham does not allow any other repairs than those listed here
above.