23
After pressing on Leak test, follow the instruction below for running the test.
Tip
►
LEO provides screen instructions to proceed with the test.
1.
Put the cap on LEO gas outlet port (1 in Figure 26)
Note
►
Use additional caps supplied in LEO’s Hard case.
2.
Put the cap on LEO gas inlet port with icon (2 in Figure 26).
1
2
Figure 26. Put caps on LEO ports.
3.
Press on
Continue
(see Figure 27 a). The pump starts operating and aspirating air. The pressure inside
LEO begins to rise. Wait until
aspiration
step is completed (see Figure 27 b). Figure 27 c appears.
a
b
c
Figure 27. How to set Pump Leak Test
–
aspiration step (a
–
b - c).
Summary of Contents for LEO
Page 1: ...LEO Handheld Analyzer for IVF Applications Manual IST1446_REV05 SV 3 1 64 0 ...
Page 2: ...This page was left blank ...
Page 16: ...12 Figure 13 Pump ...
Page 84: ...80 Figure 110 T1 Calibration Factory Reset a b b a ...
Page 88: ...84 f e c a b d 2 1 1 Figure 114 CO2 O2 MODULE insertion ...
Page 92: ...88 f e c a b d 2 1 1 Figure 118 CO2 O2 MODULE insertion after pump replacement ...