Connection of the Weighing System
DANGER
Electric shock hazard!
The electrical connection may only be carried out by an authorised electrician.
▶
Disconnect the power supply from the complete heating system before working
on the pellet boiler.
5.1
Electrical connection of the weighing system
Electrical connection of FA
Cable routing, connection of the distribution box to the weighing circuit board (meas-
uring transducer), connection to the boiler controller FA and power supply.
The wires from the load cell to the distribution may not be extended!
Ensure correct polarity for the signal cables when connecting. The polarity of the
connection signal is described on the next page.