Disconnection of the cable routing
31
10.2 Disconnection of the cable routing
The cable routing is divided into three main groups:
Cable connection
Disconnection
Time of disconnection
1
Cables to operating
device
The operating device and boiler controller form
part of the accumulator front panel. They are
removed together.
No dismantling
necessary!
2
Cables to boiler
controller
Disconnect the cable harness below the hop-
per. Loosen all pluggable connections at the
components and lay the cables in an orderly
manner by groups back to the boiler controller.
If the components have non-pluggable connec-
tions, loosen the pluggable connections at the
boiler controller and lay the cables back to the
components.
After
dismantling ca-
sing parts 1–5 and
befo-
re
dismantling the
remaining casing parts
A detailed description of the individual cable connections and the cable routing can be found in chapter
Cab-
le routing
Make sure that all plug connectors are unpluged before removing the assembly group
10.3 Dismantling of hopper with vacuum turbine and burner
Note:
Check that all cables have been disconnected and pulled back.
Installation Manual PELLEMATIC® SmartXS
Summary of Contents for PELLEMATIC SmartXS
Page 29: ...Dismantling of the housing parts 29 Installation Manual PELLEMATIC SmartXS ...
Page 30: ...PE 607 USA_FA 2 1 30 Dismantling of the housing parts ...
Page 45: ...Suggested piping arrangement for combined operation 45 Installation Manual PELLEMATIC SmartXS ...
Page 49: ...Wiring diagrams 49 Installation Manual PELLEMATIC SmartXS ...
Page 50: ...PE 607 USA_FA 2 1 50 Wiring diagrams ...
Page 51: ...Wiring diagrams 51 Installation Manual PELLEMATIC SmartXS ...
Page 52: ...PE 607 USA_FA 2 1 52 Wiring diagrams ...
Page 96: ...PE 607 USA_FA 2 1 96 Pellet boiler cautionary markings ...
Page 97: ...Pellet boiler cautionary markings 97 Installation Manual PELLEMATIC SmartXS ...
Page 98: ......
Page 99: ......