7.4
Installing the Additional Cylinder
1. The process of bringing the additional cylinder into the building and installing it is
the same as that for all other types of the accumulator.
When installing and setting up the additional cylinder, the same height must be
attained as for the adjacent accumulator.
Distance between accumulator and additional cylinder
Model size of the accumu-
lator and additional cylin-
der
Distance between centre
of accumulator and cen-
tre of additional cylinder
Space between the insula-
ted cylinders.
600 litres
1080 mm
approx. 150 mm
800 litres
1120 mm
approx. 80 mm
1000 litres
1120 mm
approx. 80 mm
2. Installation is reduced to installing the insulation and connection to the accumu-
lator.
3. See Section Installing the Insulation
7 Installing the accumulator
19
Installation manual
Summary of Contents for 1000
Page 1: ...Installation manual Accumulator 600 2000 liter ENGLISH PE590 EN ...
Page 30: ......
Page 31: ......
Page 32: ......