Operating Modes
25
Now you have to move all your equipment left to the next marker. Then you have to adjust all electrodes
again to measure all depths of the next scan point. Depending on your configuration you have to move
your equipment more or less during the measurement.
This procedure will repeat until the whole measurement is completed. If you want to abort the current
measurement push the OKM logo on the top left corner. This will definitely abort the current
measurement that cannot be resumed later on.
After the last scan has finished and the measure values are presented as shown in figure 5.6 on page 24,
push the
button. Now the screen from figure 5.8 appears.
Here you can see the graphical result of your measurement. More details about this graphical
representation can be found in section 7.2 “Interpretation of graphical representations” on page 45.
Now you have to decide if you want to save this measurement into the internal memory. If so, you have
to push the
button which brings up the screen from figure 5.9. Otherwise push the
button
to go back to the main menu without saving your measurement.
OKM GmbH
Figure 5.8: 2d graphic of a completed measurement
Number of scan point
Back to main menu
Save measurement
Depth indication
Figure 5.7: Move all equipment to the next scan point
Continue
Summary of Contents for FS Future GeoSeeker Mini
Page 1: ...FS Future Series GeoSeeker Mini User s Manual ...
Page 6: ......
Page 7: ...1 Introduction CHAPTER 1 Introduction ...
Page 12: ......
Page 13: ...2 Technical specifications CHAPTER 2 Technical specifications ...
Page 15: ...3 Scope of delivery CHAPTER 3 Scope of delivery ...
Page 30: ......
Page 48: ......