![Oklahoma Sound PRC 250 Product Handbook Download Page 4](http://html1.mh-extra.com/html/oklahoma-sound/prc-250/prc-250_product-handbook_3642342004.webp)
4
Before you begin the assembly open all the panels
from their individual wrapping to iden'fy the pan-
els properly . Be sure to open them in a way that
will not scratch the panels.
Step 1:
a) Begin by taking surface panel #C and lay it on a clean,
so$ surface facing down with the holes facing up-
wards.
b) Locate side panels #A and #B.
c) Make sure that both panels are facing inwards with
the slo1ed end of the side panel at the straight edge
of panel #C as shown.
d) Use four bolts #2, two for each panel, to secure the
side panels to the surface panel as shown. Screw the
two bolts through the holes on the top of the side
panels and into the embedded T-nuts on panel #C.
e) Use the provided hex key, part #20 to ghten the
bolt in place.
Step 2:
a) Locate the projector shelf panel #E and lay it down on
a clean surface facing down with the holes facing up-
wards.
b) A1ach four “L” brackets part #1 to the two sides of
the panel as shown. Make sure that the vercal side
is at the edge of the panel as shown.
c) Use four bolts #2 to a1ach the brackets by inserng
the bolt through the hole on the bracket and into the
embedded T-nuts in the panel.
d) Use the provided hex key, part #20 to ghten the
bolt in place.
Slo/ed edge of side panels
Straight edge of panel #C
All manuals and user guides at all-guides.com