COMBUSTION AIR FAN
The fan provides the air needed in the
combustion. It is dimensioned to provide a
sufficiently high and even air pressure for
efficient combustion in modern combustion
chamber.
REQUIRED COMBUSTION AIR QUANTITY
15 m³ of combustion air for each burnt kilo of
oil
SERVOMOTOR AND COMPOUND
REGULATOR
Controls the burner capacity and the air/fuel
ratio according to the capacity demand.
OPERATING TEMPERATURE
0... + 45 C°
.
The burner must be installed firmly. Vibrations may damage burner
or its components.
.
Never store any inflammable material in the boiler room.
.
Never use a naked flame while checking the burner or the boiler.
.
Keep the boiler door closed while starting the burner and during
burner operation.
.
Do not touch the oil pipes during burner operation. They may be
hot.
.
Do not touch the levers of the compound-regulator or adjusting rod
leading out from the compound-regulator, and do not leave things
lying close to them when burner is operating.
.
Wear hearing protectors, if there is noise in the boiler room.
.
IN CASE OF FIRE OR OTHER EMERGENCY
.
Switch off the main switch.
.
Close the main fuel shut-off valve outside the plant.
.
Take appropriate actions.
.
Local regulations and requirements must be adhered to when ins-
talling or servicing the burner.
.
Correct installation and adjustment together with regular servicing
are the most reliable guarantees of trouble-free burner operation.
.
The burner has to be installed in such a way that the motor shaft
lies horizontally; however, it is not allowed to install the burner
upside down.
.
Use only original spare parts. When ordering spare parts please
give the burner type and serial number indicated on the burner na-
meplate.
1.5.
1.5.
Inspecting boiler room
Inspecting boiler room
1.5.1
1.5.1
Take care of the boiler room
Take care of the boiler room
.
Maintain tidiness in the boiler room and keep the door closed
.
Make sure the there is always enough water (pressure) in the heating system.
.
Make sure the boiler and the chimney are swept regularly, at least once a year
.
Check the correct adjustment of the flue damper and the gate valve regularely.