CHAPTER 3 REPAIR PROCEDURES
3.2.4 Load Cell Assembly
18. Install the bottom Flexure Arm, with Flexure screw heads facing
inward,
by inserting the 3 screws, as shown in Figure 3-73.
Screws connecting
bottom Flexure Arm
to frame. Flexure
screw heads face
inward.
Screw connecting
bottom Flexure
Arm to frame
Figure 3-77. Installing the bottom Flexure Arm.
19. After the bottom Flexure Arm Assembly is installed, remove the Threaded Rod.
20. Install the top Flexure Arm, with Flexure screw heads facing
outward,
by inserting the 3 screws, as shown in Figure 3-78.
Figure 3-78. Top Flexure Arm Assembly, with
Flexure screw heads facing outward.
Figure 3-79. Installing the upper Flexure Arm.
Discovery Balance Service Manual
3-39
Ohaus Corporation www.ohaus.com