CHAPTER 4 TESTING
4.5.3 Full Load Test
1. After the Off Center Load Test has been passed, test the Base’s full capacity
according to the Specification Tables 1-1 through 1-6. The Base must meet all
specifications as listed.
2. If the Base fails the Full Load Test, check and set the Overload Stops.
(See Section 3.3.)
Defender™ B & V Series Service Manual
4-5
Ohaus Corporation www.ohaus.com
Summary of Contents for Defender D30BR
Page 2: ......
Page 4: ......
Page 12: ...CHAPTER 1 INTRODUCTION Ohaus Corporation www ohaus com 1 6 Defender B V Series Service Manual...
Page 24: ...CHAPTER 4 TESTING Ohaus Corporation www ohaus com 4 6 Defender B V Series Service Manual...
Page 30: ...APPENDIX A GLOSSARY Ohaus Corporation www ohaus com A 2 Defender B V Series Service Manual...
Page 31: ......
Page 32: ...80252594 P N 80252594 A SERVICE MANUAL DEFENDER B V SERIES BASES...