CHAPTER 4 TESTING
4.1 TESTING
Before and after servicing a CKW Base, conduct Load Cell Resistance Checks, Calibration
using an external Indicator, and Performance Tests to confirm that the base meets
specifications. Allow time for the base to stabilize after moving it from an area which is at a
different temperature than the area where it is to be operated. Allow one hour for each 5°F
(2.7°C) temperature change before using the base.
The following tests require a Digital Multimeter, an Indicator and hand tools. The Digital DC
Voltmeter should have a reading range from 1 mV to 50 V full-scale. It should be capable of
reading differences of one micro-volt per increment. The indicator can be either the Ohaus
CKW-55, or an equivalent commercial indicator.
NOTE:
Make sure the test area is free from drafts and that the base rests on a level and
vibration-free surface.
4.2 Load Cell Resistance Checks
Use an ohm-meter to measure across each pair of wires in turn, and compare the results with
Table 4-1. The Load Cell must be completely disconnected from the Indicator and at no load
when these tests are made.
In addition to the four resistance elements which make up the Wheatstone Bridge, there are
commonly one or two resistors in the excitation lines. The resistance across the excitation wires
is usually the highest resistance measured across any two wires.
If the resistance readings are in the range specified, skip to the next section. If they are
incorrect – for example, outside the expected range, open circuit or short-circuit across any two
wires. If the Load Cell is defective, replace it. (See Chapter 3.)
TABLE 4-1. LOAD CELL RESISTANCE READINGS
RESISTANCE READINGS IN OHMS
Unit
Ex+ to Ex
–
S+ to S
–
Ex+ to S
–
Ex+ to S+
Ex
–
to S+
Ex
–
to S
–
CKW
387 ± 10
350 ± 4
297 ± 10
297 ± 10
262.5 ± 10
262.5 ± 10
4.3 Calibration with an External Indicator
1. Install the Load Cell. (See Section 3.2.)
2. Connect the excitation, signal shield and sensing wires (if provided), to the Indicator.
Calibrate the Indicator to read the load in the units required, for example, kilograms or
grams. (Consult the Indicator instruction manual for calibration procedures.) For
calibration mass weights, see Table 1-1, in Chapter 1.
3. Check that the Indicator is reading correctly over a range of values.
CKW Base Series Service Manual
4-1
Ohaus Corporation www.ohaus.com
Summary of Contents for CKW3R
Page 2: ......
Page 4: ......
Page 6: ...TABLE OF CONTENTS CKW Base Series Scales Service Manual ii Ohaus Corporation www ohaus com...
Page 12: ...CHAPTER 1 INTRODUCTION Ohaus Corporation www ohaus com 1 6 CKW Base Series Service Manual...
Page 14: ...CHAPTER 2 DIAGNOSTIC GUIDE Ohaus Corporation www ohaus com 2 2 CKW Base Series Service Manual...
Page 22: ...CHAPTER 4 TESTING Ohaus Corporation www ohaus com 4 6 CKW Base Series Service Manual...
Page 28: ...APPENDIX A GLOSSARY Ohaus Corporation www ohaus com A 2 CKW Base Series Service Manual...
Page 29: ......
Page 30: ...80252592 P N 80252592 SERVICE MANUAL CKW BASES...