background image

Screw through the door side

supports into the top door bar, on

each side. Repeat for the two

center door bars.

STEP

 

1

Attach the bottom door bar as in

step 1. Make sure that the double

edge of the bar is the lower edge.

STEP

2

Bolt the door slider to the outside

of the top door bar. The curved end

with the door rollers should stand

above the top door bar, with the

rollers visible.

STEP

 

3

Make sure the door seals are in

place in the two door side support

bars, and trim any rubber that

sticks out.

Lift the door into an upright position

and ease the bottom bar onto the

door track on the front floor bar.

Slide the door slider onto the door

rail, sliding the rollers onto the

track.

Attach the plastic rail end caps on

each end of the door rail. Tighten

all the bolts in the door structure so

that the door is held firmly and

cannot wobble

STEP

 

7

Follow the steps below to assemble the Door.

44

44

31

STEP

 

4

PAGE 18

49

50

19

14

14

06

Right

Left

24

28

27

42

20

24

20

27

STEP

 

5

STEP

 

6

20

27

34

17

01

24

14

28

19

20

28

Summary of Contents for Walk-in OGAL-466

Page 1: ...OGrow Walk in 6 x 4 LAWN AND GARDEN GREENHOUSE MODEL OGAL 466 With Heavy Duty Aluminium Frame...

Page 2: ...safety instructions in this manual If you have any questions please contact our Customer Service Department Let sGrow Together Parts List Side Walls Back Wall Front Wall Door Frame Roof and Full Stru...

Page 3: ...t Pole Top Doorway Beam Corner Bracket Door Rail Vent Support Bar Rear Floor Bar 17 18 19 20 21 22 23 24 25 26 27 28 30 31 32 33 PART PART NAME PART IMAGE QTY 1 4 1 1 1 4 2 1 2 2 1 1 4 1 2 2 Front Flo...

Page 4: ...ar Top Roof Bar Gutter Bar Long Door Support Bolt Door Frame Spacer Spanner Wrench Rubber Seal Bolt Door Screw 45 46 47 48 49 50 51 52 A I PART PART NAME PART IMAGE 12 92 8 4 1 1 2 82 19 Vent Screw Pa...

Page 5: ...en tired or when under the influence of alcohol drugs or medication 8 Build the Greenhouse on a flat and level surface A concrete foundation is recommended for a high quality installation 9 WARNING Th...

Page 6: ...ou are to use consult a professional It is always your responsibility to ensure that the greenhouse is properly anchored Ogrow cannot be held responsible for personal injury damage to the greenhouse o...

Page 7: ...sly If this is your first time building a greenhouse it may take a good chunk of a day to complete the construction properly Prepare the tools you will need A Drill A Screwdriver A Spanner Part 41 Lay...

Page 8: ...oor bar and gutter bar should be perpendicular to the floor with the wider end at the top PART 1 SIDE WALLS A S S E M B L I N G T H E G R E E N H O U S E 36 34 10 22 Part Part Name Part Image Qty 10 2...

Page 9: ...assemble the Side Walls Repeat the above steps to make the second side wall 43 52 43 52 43 52 10 34 34 10 22 36 PAGE 9 Bolt the top of the side support poles to the outside of the gutter bar Bolt the...

Page 10: ...perpendicular to the floor with the wider end at the top PART 2 BACK WALL A S S E M B L I N G T H E G R E E N H O U S E 16 9 8 21 05 04 22 1 1 22 13 13 Part Part Name Part Image Qty 1 4 5 8 9 13 21 22...

Page 11: ...pport pole Then bolt the top of the support poles to the outside of the roof beams using another bolt STEP 4 On the inside of each corner bracket attach the diagonal supports to the lowest bolt and th...

Page 12: ...g Door Support Bolt Door Frame Spacer Bolt Nut 25 06 23 01 02 07 23 25 01 12 03 17 14 19 PAGE 12 STEP 1 5 STEP 3 STEP 2 STEP 7 STEP 4 STEP 6 NOTE OUTSIDE VIEW Lay out all the parts needed for the fron...

Page 13: ...each corner bracket attach the diagonal supports to the lowest bolt and the horizontal support to the second to lowest bolt Open the bolts position the supports and refasten the bolts STEP 5 Bolt the...

Page 14: ...ttach the vertical door rail support to the end of the door rail that is jutting out of the structure STEP 3 Secure the bottom of the vertical door rail support to the outside of the roof beam using t...

Page 15: ...Collect all the parts needed for the roof and keep on the side until necessary PART 4 FULL STRUCTURE AND ROOF A S S E M B L I N G T H E G R E E N H O U S E Part Part Name Part Image Qty 11 35 47 48 43...

Page 16: ...underside of the roof beams securing with two bolts one through each of the roof beams Repeat at the other end of the roof 4 Attach the roof support poles to the outside of the top roof bar and the gu...

Page 17: ...ART 5 THE DOOR A S S E M B L I N G T H E G R E E N H O U S E 20 28 24 26 26 27 Part 20 24 26 27 28 31 44 49 50 43 52 Left Door Support Top Door Bar Center Door Bar Bottom Door Bar Right Door Support D...

Page 18: ...seals are in place in the two door side support bars and trim any rubber that sticks out Lift the door into an upright position and ease the bottom bar onto the door track on the front floor bar Slide...

Page 19: ...n is the same Pay particular attention to the way that each bar should be laid using the images for guidance PART 6 THE VENTS A S S E M B L I N G T H E G R E E N H O U S E Part Part Name Part Image Qt...

Page 20: ...that the diagonals are the same and then tighten the bolts in each corner Slide the completed vent into the top roof bar to the space between the two roof support poles Turn the vent over and attach...

Page 21: ...nel with panel clips placing a clip wherever there is a marking on the diagrams below Using two fingers apply pressure to the two rounded points of the clip positioning them under the polycarbonate pa...

Page 22: ...inserting the side wall panels securing each panel with clips before continuing to the next panel Next insert the back and front panels and lastly insert the panels of the door Slide the panels into t...

Reviews: