background image

 2 

 

 
 

 
 

Contents 

 
   
 
 

  1.  Introduction 

 

 

 

 

 

Page           3 

  2.  Safety Instructions 

 

 

 

 

Page   4 –   5 

  3.  Configuration/Operation/Illustrations 

 

Page   6 –   7  

  4.  Start-up/Operation/Shut-down 

 

 

Page   8 – 10 

  5.  Maintenance and Care 

 

 

 

Page 11 – 12 

  6.  Electric Wiring Diagrams 

 

 

 

Page         13  

  7.  Technical Data   

 

 

 

 

Page         13 

  8.  Trouble Shooting 

 

 

 

 

Page         14 

  9.  Declaration of Conformity 

 

 

 

Page         15 

E

3

3

4

-0

2/

05-

A

G

,V

S

-6/

05 

Summary of Contents for E 334

Page 1: ...To be read before start up Operation Manual E 334 von Oertzen GmbH Ferdinand Harten Str 10 22949 Ammersbek Tel 49 40 604110 Fax 49 40 6041149 www oertzen gmbh de info oertzen gmbh de 6 05 ...

Page 2: ... Configuration Operation Illustrations Page 6 7 4 Start up Operation Shut down Page 8 10 5 Maintenance and Care Page 11 12 6 Electric Wiring Diagrams Page 13 7 Technical Data Page 13 8 Trouble Shooting Page 14 9 Declaration of Conformity Page 15 E334 02 05 AG VS 6 05 ...

Page 3: ...ery year by qualified personnel Inspection results to be recorded and to be made available to authorities their on request OERTZEN offers qualified service personnel to carry out safety inspections at attractive prices The packing materials plastic foil wood cardboard boxes nails etc are potentially dangerous should be kept away from children and disposed according to environmental requirements Th...

Page 4: ...n Therefore high pressure hoses to be carefully inspected before start up and replaced by original OERTZEN equipment in case of damage Use of other than original OERTZEN equipment hand nut marked with OERTZEN results in expiry of the EC Declaration of Conformity as well as product liability and warranty Used or damaged high pressure hoses must never be repaired and reused but to be replaced by ori...

Page 5: ...pprox 50 cm Strictly follow instructions in para Pipe Cleaning chapter Operation During loading hoisting device to be fastened properly at jack rings Ensure balanced load Repair work in the high pressure section of the machine pump hoses piping only to be carried out by qualified personnel After work the machine to be locked and secured against unauthorized accidental operation by means of the saf...

Page 6: ...ich cannot be taken by the nozzle into the suction line of the pump It also allows to continuously adjust working pressure and water flow as required The working pressure can be adjusted by means of the turning handle at the double lance and so be adjusted as required The machine is equipped with a circulation shut off system and additionally with a thermo valve in order to protect the pump agains...

Page 7: ...7 ...

Page 8: ...In order to guarantee proper function and trouble free operation the following checks to be carried out during working Observe function of indicator lights monitors Observe pressure variations Observe leaks at high pressure pump hose pipes connections Observe unnormal noise In case of malfunctions immediately stop machine eliminate cause according to chapter Trouble Shooting call qualified service...

Page 9: ...stol bleed unit Push ON OFF switch 2 Be aware of significant recoil Ensure stable foothold Carry out cleaning task Pressure Regulation The pressure can continuously be adjusted as required at the regulation handle of the double lance Counter clockwise pressure reduction Clockwise pressure increase Pressure Flow Regulation Pressure and flow rate can continuously be adjusted as required at the turni...

Page 10: ...ch off machine by means of the ON OFF switch 2 Depressurize spray pistol by shortly opening and closing Lock spray pistol Disconnect machine from water and power source Thoroughly clean high pressure hose In case of damage cuts abrasions kinks etc replace high pressure hose for safety reasons Only original OERTZEN high pressure hoses to be used Otherwise Declaration of Conformity and warranty will...

Page 11: ...tions at attractive prices In order to guarantee reliability and trouble free operation of the machine it is of vital interest to follow the instructions below If the required maintenance intervals are disregarded warranty will expire High Pressure Pump First oil change after 50 operating hours further oil changes after every 500 operating hours minimum once per year In case the oil becomes milky ...

Page 12: ...e to be protected as described below Mix 2 l of a 1 1 water anti freeze liquid e g Glysantin in a clean vessel dip water connecting hose into anti freeze liquid and start pump Open spray pistol stop valve and return drawn off anti freeze liquid into the vessel so allowing the liquid to circulate through the system The frost protection switch to be kept pressed during the procedure Spray pistol sto...

Page 13: ...essure 230 bar Working pressure adjustable 210 bar Normal current 50 Hz 3 400 V Electric power 15 HP 12 5 kW Pump speed 1420 1 min Power consumption 24 A Noise level Lp Lw acc to DIN EN ISO 3744 69 81 dB A Recoil 116 N Dimensions L x W x H mm 780 x 690 x 800 mm Weight 146 kg Spray nozzle 1033 HIP Order No 10 000 334 ...

Page 14: ... water supply Electric motor suddenly stops motor protection switch trips Poor water supply Fuse burnt phase missing Low voltage Motor protection switch defective Operating pressure high Eliminate cause and re start machine with ON OFF switch Replace fuse If it burns again or motor is noisy call qualified service Ensure correct power supply Call qualified service Clean replace nozzle see Technical...

Page 15: ...15 ...

Reviews: