38
Planetary Final Drive Service Manual
Input Carrier Subassembly
1.
Apply a liberal coat of grease to the bore of the Planet Gear (8F). This will enable the Needle
Rollers (8C) to be held in place during assembly.
2.
Install Needle Rollers (8C) into the bore of each of the three Planet Gears (8F).
NOTE:
The last roller installed must be installed end wise. That is, the end of the last roller
must be placed in between the ends of the two rollers that form the space, and then slide
parallel to the other rollers into place.
3.
Place the Carrier (8A) into the tool fixture so that one of the roll pin holes is straight up.
4.
Start Planet Shaft (8D), with end opposite roll pin hole first, through the planet shaft hole in
Carrier (8A), making sure that the roll pin hole in the planet shaft is straight up.
5.
Using ample grease to hold them in position, slide four Washers (8B) onto the Planet Shaft
(8D).
6.
Place the Planet Gear (8F) into position and push the Planet Shaft (8D) through the planet
gear without going all the way through carrier.
Continued on Next Page
Summary of Contents for Torque-Hub CW18 Series
Page 1: ...1 Torque Hub Planetary Final Drive CW18 Series Service Manual Rev 01 28 14 ...
Page 17: ...17 DISASSEMBLY ...
Page 18: ...18 Planetary Final Drive Service Manual Main Disassembly Continued on Next Page ...
Page 22: ...22 Planetary Final Drive Service Manual Cover Disassembly Continued on Next Page ...
Page 24: ...24 Planetary Final Drive Service Manual Input Coupling Disassembly Continued on Next Page ...
Page 26: ...26 Planetary Final Drive Service Manual Input Brake Disassembly Continued on Next Page ...
Page 28: ...28 Planetary Final Drive Service Manual Housing Spindle Disassembly Continued on Next Page ...
Page 29: ...29 1 Set the unit on a bench so that the Spindle 1A flange is down Continued on Next Page ...
Page 34: ...34 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 35: ...35 ASSEMBLY ...
Page 36: ...36 Planetary Final Drive Service Manual Cover Subassembly Continued on Next Page ...
Page 41: ...41 Planetary Final Drive Service Manual Input Coupling Subassembly Continued on Next Page ...
Page 43: ...43 Final Drive Service Manual Housing Spindle Subassembly Continued on Next Page ...
Page 46: ...46 Planetary Final Drive Service Manual Main Assembly Continued on Next Page ...
Page 48: ...48 Continued on Next Page ...
Page 51: ...51 Planetary Final Drive Service Manual Assembly Drawing ...
Page 54: ...54 Planetary Final Drive Repair Instructions Assembly Tools T163056 ROLL CHECKING FIXTURE ...
Page 55: ...55 T180149 LEAK TEST ADAPTER ...
Page 56: ...56 T184729 LEAK TEST ADAPTER ...
Page 57: ...57 T182969 ROLL CHECK TOOL ...
Page 58: ...58 T198122 BRAKE ASSEMBLY CONCENTRICITY ...
Page 59: ...59 T201476 LEAK TEST ADAPTER PLATE ...
Page 60: ...60 T176834 ASSEMBLY PRESSING TOOL ...
Page 61: ...61 T176703 BEARING CONE PRESSING TOOL ...
Page 62: ...62 T176285 ASSEMBLY LOCKNUT WRENCH ...
Page 63: ...63 T174699 ASSEMBLY PRESSING TOOL ...
Page 64: ...64 T219294 SEAL PRESSING TOOL ...
Page 65: ...65 T214917 SEAL PRESSING TOOL ...
Page 66: ...66 T181663 BRAKE ASSEMBLY CONCENTRICITY FIXTURE ...
Page 67: ...67 T184035 BRAKE ASSEMBLY CONCENTRICITY FIXTURE ...
Page 68: ...68 T188489 BRAKE ASSEMBLY CONCENTRICITY FIXTURE ...
Page 69: ...69 T205279 LEAK TEST ADAPTER PLATE ...