Odyssey FREEDOM Series Assembly And Operation Instructions Download Page 2

ASSEMBLY INSTRUCTIONS

1. Remove all Tube Sections and place on a flat ground as in (FIG. 1).

SECTION 1 IS STORED  INSIDE OF SECTION 2. Slide sections 1
and 3 out to the desired total tube length. 

(Usually pool width plus

two feet).  Refer to Table #1 and (FIG. 1).

PHILLIPS
SHOULDER
BOLT

BEARING RACE

WASHER

HEX HEAD BOLT

OUTER TUBE

INNER

TUBE

NEOPRENE INSERT BODY

HEX HEAD BOLT

NEOPRENE WILL

MUSHROOM AS TIGHTENED

PERFECT

TIGHTNESS

TOO TIGHT

STEP 2

STEP 3

STEP 4

OUTER TUBE

SECTION 2

INNER TUBE

SECTION 1 OR 3

STEP 5

NEOPRENE

INSERT

3”

14”

STEP 4

STEP 2

STEP 3

STEP 5

END

VIEW

90

°

90

°

90

°

90

°

3”

14”

INITIAL PREPARATIONS

1. Prior to assembly, select the most suitable location for the reel, 

normally 2 ft. from either end of the pool. However, on irregular pools,
a location closer to the  center of the pool may be preferred and at the
pools maximum width. Other considerations are obstructions (diving
boards, hand rails, etc). When in doubt, consult your dealer or call
Odyssey for an evaluation of your reel placement.

2.  BLANKET PREPARATION: In order for your solar blanket to roll up

neatly on the solor reel, allow the blanket to relax on the pool for a
day or two and let the heat of the sun iron out the folds and creases
of the blanket.

SECTION-1

LENGTH-A

SECTION-3

SECTION-2

LENGTH-A

POOL WIDTH + 2 FT.

TABLE #1

(FIG. 1)

NOTE: Step 2-9 must be followed

or tube sagging will occur

STEP 6

POOL WIDTH

TOTAL TUBE

LENGTH A

FEET

LENGTH

FEET

FEET

14

16’

4

16

18’

5

18

20’

6

20

22’

7

LAZY “L”

RETANGULAR

OVAL WITH EXTENSION

NOTE:  Under no circumstances should the system 

be  operated if Length A exceeds 9 ft.
Tubes may be cut in size in order to accomadate 
smallerpool widths. It is recommended to cut an 
equal amount off sections 1 & 3.

(FIG. 2)

(FIG. 3)

(FIG. 4)

EMX INST. 3/03

2. To attach the LEFT SIDE of section 1 & 2 tubes.

Using (FIG. 2), with a power drill and a sharp 1/2” bit, Drill a
hole 3” from the left end of the  section 2 tube and in the center
of the groove cut in the tube. Drill through both section 1 and
section 2.

(Refer to Step 2)

3. Place neoprene tube insert into the hole. Using a hex 

socket wrench and a 7/16” socket, rotate hex head
two (2) complete turns and stop.

(Refer to Step 2)

4. Rotate tube sections 90° and drill a hole 14” from 

the left end of the tube section 2.

(Refer to Step 3)

Repeat all instructions in #3 above.

5. Rotate tube sections 90° and drill a hole 3” from 

the 

left end

of the tube section 2.

(Refer to Step 4)

Repeat all instructions in #3 above.

6. Rotate tube sections 90° and drill a hole 14” from 

the left end of the tube section 2.

(Refer to Step 5)

Repeat all instructions in #3 above.

7. Rotate tube sections 90°. Using a hex socket 

wrench and a 7/16” socket, to tighten each hex 
head an additional two (2) complete turns. 

8. Continue to rotate tubes and tighten hex heads until all are tight

and neoprene insert body mushrooms. 
Do not overtighten. (SEE FIG. 3)

9. To attach the RIGHT SIDE of section 2 & 3 tubes.

Repeat instructions #2 thru #8 above, but taking all hole 
measurements from the RIGHT END of tube section 2.

10. ATTACH RACE AND HANDLE TO TUBE– Place the main

frames in contact with the pool deck, insert tube through the
center opening. (Refer to (FIG. 4)

11. Slide bearing race assembly onto each handwheel and seat in

main frame bushing – center opening. Refer to (Step 6)

Reviews: