ODM TTK-720 User Manual Download Page 10

Page 10

M-UM010-02 TTK 720 06/18

The VIS 300C probe and monitor combination allows users to inspect fiber endfaces using an 

automated analysis algorithm. This section gives an overview of inspection procedures.

Fiber Scoping

3

3a - Adjust Settings

The VIS 300C has several automated analysis algorithms available. Choose from the available 

options in the “Settings” menu under “IEC Profile.”

Touch 

“IEC Profile”

Choose from a list of algorithms to use for automated analysis. All algorithms are based on the IEC 

standards document 61300-3-35.

Touch 

Appropriate  

IEC Profile

NOTE:

SM UPC ≥45dB

 is by 

far the most common 

fiber type used in 

the wireless industry. 

Contact ODM if you 

are unsure of which 

algorithm to use.

Summary of Contents for TTK-720

Page 1: ...TTK 720 Wireless Industry Fiber Test Kit User Guide...

Page 2: ...C 60 degree bulkhead inspection adapter for VIS 300C probe May be used to scope difficult bulkheads such as those in tower top enclosures AC 048B 1 25mm universal inspection adapter for VIS 300C probe...

Page 3: ...Page 3 M UM010 02 TTK 720 06 18 VIS 300C PM 02 V VFL OPM and Scope included DLS 355 AC 049B AC 092 AC 089 AC 048B AC 044B AC 040B AC 107B AC 523 AC 602 AC 4500 Kit Overview...

Page 4: ...cope images loss readings etc in one place This section covers setting up for a new test site Creating a New Folder in VIS 300C Software 2 Fiber inspection should be performed before making any connec...

Page 5: ...he right will be plugged into the power brick to create the charging device Allow the VIS 300C to charge fully between uses The VIS 300C can be used while charging please be aware that an internal fan...

Page 6: ...1310 Optical Design Manufacturing Inc www odm inc com DLS 355 Dual Laser Source 2kHz LOW BAT 1550 1310 Optical Design Manufacturing Inc www odm inc com DLS 355 Dual Laser Source 2kHz LOW BAT 1550 131...

Page 7: ...cleaning regimen will keep kit components functional for a longer period of time AC 4500 Each arrow in the diagram at left indicates a fiber ferrule that should be inspected and cleaned between uses...

Page 8: ...f images and power meter readings Follow the steps below to create a new folder when beginning a project Creating a New Folder in VIS 300C Software 2 Touch Projects Button Main Inspection Screen Touch...

Page 9: ...en back to the Main Inspection Screen Enter all Project Details Touch OK Touch Settings Icon 2b Change Project Information If you ever need to change this information touch Projects on the main screen...

Page 10: ...IS 300C has several automated analysis algorithms available Choose from the available options in the Settings menu under IEC Profile Touch IEC Profile Choose from a list of algorithms to use for autom...

Page 11: ...is acceptable for use Insert the fiber ferrule into the inspection tip on the VIS 300C inspection probe as shown above The ferrule should be inserted fully until it stops inside the tip Use the focus...

Page 12: ...need to rotate the cleaner Re inspect the fiber after one click to see if debris has been cleared from the endface AC 092 Pad and Fiber Wash Pen Wet Dry Clean Method Isolate a single wipe on the pad...

Page 13: ...try cleaning again or if the image does not need to be saved press the Back button onscreen or the button on the VIS 300C probe to return to a live image 3d Run Automated Analysis When the fiber has b...

Page 14: ...out reporting follow these steps to save the image Touch Save Touch the text line to bring up the keyboard Enter a name for the image Touch Done to close the keyboard then touch Confirm ProjectName Pr...

Page 15: ...fiber dB Loss Testing 4 4a Connect Test Jumpers for Referencing The equipment must be referenced before testing begins Plug the AC 523 into the DLS 355 and VIS 300C OPM port Connect the paired LC end...

Page 16: ...nm The Power Meter screen interface will appear All power meter testing dB loss testing will be done from this screen IMPORTANT Ensure DLS 355 is turned on Press the Wavelength button to choose the wa...

Page 17: ...be set to zero MAX allowable loss varies by build Check your build documentation if you are not sure what to set for a MAX loss The most common MAX loss setting is 3dB Touch OK when finished Any readi...

Page 18: ...air at the tower bottom See diagram below NOTE Wireless carrier preferences vary on how these tests should be conducted The diagram above represents the most common and most basic test scenario Always...

Page 19: ...air through the loopback and back down the other side of the pair 0 50dB 1550nm Touch Save Connect the test jumper and loopback to each fiber pair and save the reading for each pair This box will appe...

Page 20: ...22 17 11 50 02 22 17 11 55 0 50dB 1550nm 1 78dB 1550nm 2 05dB 1550nm 0 93dB 1550nm 0 09dB 1550nm 1B 1C 1D 1E 0 50dB 1550nm 1A 02 22 17 11 39 02 22 17 11 44 02 22 17 12 15 02 22 17 11 47 02 22 17 11 50...

Page 21: ...e VIS 300C has a 2 5mm universal output Plug a fiber with a 2 5mm ferrule completely into this port When the VFL is ON or modulating red light will emanate from the other end of the fiber 5km range an...

Page 22: ...e shared via email or cloud storage connect to a Wi Fi network before continuing If you are not near a Wi Fi network or will offload the reports via USB skip this step Touch Settings Touch WiFi Settin...

Page 23: ...folders Touch the project folder which contains all of the data to be included in the closeout report 16 8 Touch Current Project 6b Create Reports If the reports will be shared via email or cloud stor...

Page 24: ...shown on the next screen to send the reports via Wi Fi or touch another part of the screen to skip Wi Fi sharing The results can be offloaded via USB at a later date If reports have never been created...

Page 25: ...rowser Email If emailed the reports will arrive in the recipient s Inbox as HTML files If you sent the files to yourself simply double click the file to open it in your preferred browser Google Drive...

Page 26: ...ed Probe Input on the side panel The VIS 300C will be recognized as an external storage device If given the option select Open Folder to View Files Navigate to the file path VIS 300C Internal Storage...

Page 27: ...when the Project Folder was created Power Meter Reports will contain all power meter readings saved in the Project Folder along with any information entered when the Project Folder was created PASS FA...

Page 28: ...low the instructions below 1 With the report open in a browser press CTRL P on your keyboard to open the Print dialogue Note that the report appears formatted to an 8 5 x 11 page 2 Look to the top lef...

Page 29: ...le Adapter AC 044B LC Adapter AC 045B LC APC Adapter AC 107B LC 60 Degree Angle Adapter AC 051B OptiTap Adapter AC 046B ST Adapter AC 047B MTP APC Adapter AC 050B MTP MPO Straight Adapter AC 048B 1 25...

Page 30: ...ions The course covers 1 Fiber Optic Theory Multimode and Single Mode Fiber Construction of Fiber Optic Cables Connectors and Ferrule Types 2 Connector Inspection IEC 61300 3 35 Standard Understanding...

Reviews: