
1.
Place the bathtub and the base in their final
position. Adjust the legs of the bathtub so that they
support the tub. Make sure that the tiling flange of the
base is well inserted between the support and the
block.
The top of the bathtub must be levelled on both sides,
and must be at 19 ¼’’ distance from the top of the
base. Mark the position of the base.
2.
Remove the bathtub and install the base as
described in the Installation Manual provided with the
base.
3.
Install the faucets, the drain and the overflow.
Please note that the faucets can be wall or floor
mounted.
Use flexible hoses for hot/cold water supply.
Connect the bath drain into the floor drain without any
glue to make sure the installation is appropriate.
4.
Place the bathtub on blocks above its final position.
Make
required
connections
(hot/cold
water,
chromatherapy light, keypad, water detector, blower).
The blower can be relocated away from its position
inside the skirt, to allow an easy access.
Test water supply connections and test drain to make
sure there is no leakage. After testing, use a small
container to collect water under the bath.