T.007: 5.c Pre-test Battery Calculations
rescueME EPIRB1 Battery Calculations for Cospas-Sarsat
Designation
Units
Value
Comments
TCS
Years
2.5
TBR
Years
12.5
A-hrs
1.7
CBn
A-hrs
3.4
Lsdc
%
0.84
Increase over Cell
Manufactureres data
(0.46%) agreed
between C/S and
Ocean Signal
Lcbn
mA-hrs
404.10
Nst
12
Ist
mA
40.75
Tst
Sec
16.50
Lst
mA-hrs
28.016
Ngst
12
Igst
mA
11.5
Tgst
sec
315.5
Lgst
mA-hrs
12.09
ISB
mA
2.00E-05
L
OTH
mA-hrs
14.4
Not Originally
Calculated*
Lisb
mA-hrs
2.19
LCDC
mA-hrs
488.30
Declared beacon battery replacement period (from date of
installation in the beacon to expiry date marked on the beacon)
Characteristic
Beacon manufacturers declared maximum allowed cell shelf-life
(from date of cell manufacture to date of battery pack installation
in the beacon)
Battery pack electrical configuration
2 parallel packs each of 3 123 cells in
series
Cell model and cell chemistry
Q-Lite CR123A
Lithium Manganese Dioxide
Nominal cell capacity
Nominal battery pack capacity
Annual battery cell capacity loss (self-discharge) due to aging, as
specified by cell manufacturer at ambient temperature
Calculated battery pack capacity loss due to self-discharge:
LCBN =CBN - [CBN *(1 - LSDC /100) ^(TBR+Dcage)]
Number of self-tests per year NST
Average battery current during a self-test IST mA
Maximum duration of a self-test TST sec
Calculated battery pack capacity loss due to self-tests during
battery replacement period: LST = IST*TST*TBR*NST / 3600
Maximum Number of GNSS self-tests between battery
Average battery current during a GNSS self-test of maximum
Maximum duration of a GNSS self-test TGST sec
Calculated battery pack capacity loss due to GNSS self-tests
during battery replacement period: LGST = IGST*TGST*NGST /
3600
Average stand-by battery pack current
Battery pack capacity loss due to constant operation of circuitry
prior to beacon activation: LISB = ISB*TBR*8760
Other Capacity Losses
Calculated value of the battery pack pre-test discharge LCDC
= LCBN + 1.65*(LST + LGST + LISB)/1000 + L
OTH
/1000
*Additional current drawn by the water contacts when activated.
S Nolan Technical Director Ocean Signal Limited
6
th
August 2014
PE TC "Omega"
Report 14/171 - Issue 3
Page 232 of 337
Summary of Contents for rescueME EPIRB1
Page 1: ...PE TC Omega Report 14 171 Issue 3 Page 224 of 337 ...
Page 2: ...PE TC Omega Report 14 171 Issue 3 Page 225 of 337 ...
Page 3: ...PE TC Omega Report 14 171 Issue 3 Page 226 of 337 ...
Page 4: ...PE TC Omega Report 14 171 Issue 3 Page 227 of 337 ...
Page 28: ...16 Version 00 03 25 07 2014 PE TC Omega Report 14 171 Issue 3 Page 251 of 337 ...
Page 34: ...PE TC Omega Report 14 171 Issue 3 Page 257 of 337 ...