INSTALLATION INSTRUCTIONS
RECEIVING—INSPECTION
:
Upon receiving your Air Boss unit, inspect the packaging for any
damage. All units are shipped on a skid, and packaged in a triple-wall
carton for added protection. In shipment, some wear may occur on the
packaging. If the packaging is heavily damaged or broken, file a claim
with the freight company immediately. Carefully unpack the unit and
remove all wrapping materials. Save all documentation and fill out the
Warranty Card and mail it to Oceanaire.
BEFORE INSTALLING
Check the air conditioner/spot cooler for any damage. All Oceanaire
products are thoroughly inspected at the factory and carefully
packaged. If any damage is evident, file a claim with the delivering
carrier immediately.
ELECTRICAL REQUIREMENTS
Check the nameplate located on the back of the unit to make certain
that the proper power is available for the unit. Refer to "Specifications"
section for voltage and amperage requirements. For proper NEMA
receptacles, refer to "Electrical service plug configuration". When using
extension cords, use the properly sized cord as specified, and check
cord voltage to the unit.
TIME DELAY FUSES/CIRCUIT BREAKERS ARE RECOMMENDED
WARNING—OPERATING THE UNIT ON
IMPROPER VOLTAGE WILL VOID THE
WARRANTY
ACCESSORIES
Verify that all accessories are correct for the model, and that they
installed in accordance with all instructions.
START-UP
Install the unit in accordance with all local and state building codes, and
install all accessories. Allow for a clearance around the unit for future
maintenance and/or service. Level unit and lock casters, when
available. Connect power and test the LCDI on the power cord (if
available). Power up unit, via thermostat and check for proper
operation. Refer to Thermostat Operation for more details.
14