Installation and Operation Precautions
18 cm4520
Safety Information and Getting Started
1
Installation and Operation Precautions
1-12
cm4520
In
st
al
la
tio
n
an
d
O
pe
ra
tio
n
Pr
ec
au
tio
ns
C
ha
pt
er
1
1.4
Space Requirements
To ensure that machine operation, consumables replenishing, part replace-
ment, and regular maintenance can easily be performed, adhere to the rec-
ommended space requirements detailed below.
2
Reminder
Be sure to allow a clearance of 100 mm (4 in.) or more at the back of this
machine for the ventilation duct.
Unit: mm (inch)
9238+9289
285
(11-1/4)
1303
(51-1/4)
311
(12-1/4)
421
(16-1/2)
765
(30)
100
(4)
358
(1
4)
11
63
(4
5-
3/
4)