94
Phase 1 adjustment
Turn the adjusting toggle 90° clockwise.
The track adapter is now connected to
phase 1.
Phase 2 adjustment
(3-phase track adapter only)
Turn the adjusting toggle 90°
anticlockwise.
The track adapter is now connected to
phase 2.
Phase 3 adjustment
(3-phase track adapter only)
Pull out the adjusting toggle.
Turn it 90° anticlockwise.
The track adapter is now connected to
phase 3.
32
1 0
32
1 0
3 2
10
Installation
Summary of Contents for Piu alto 3d NV
Page 1: ...Più alto 3d NV Montageanleitung mounting instructions up flat plug track ...
Page 2: ......
Page 3: ...Più alto 3d NV Montageanleitung S 2 mounting instructions p 51 up flat plug track ...
Page 4: ...2 ...
Page 8: ...6 ...
Page 9: ...7 Montage head 1 ...
Page 10: ...8 ...
Page 18: ...16 ...
Page 20: ...18 Installation ...
Page 30: ...28 Installation ...
Page 36: ...34 Installation ...
Page 42: ...40 3 2 1 0 Installation ...
Page 49: ...47 ...
Page 53: ...Più alto 3d NV mounting instructions up flat plug track ...
Page 54: ...52 ...
Page 58: ...56 ...
Page 59: ...57 Assembling the head 1 ...
Page 60: ...58 ...
Page 68: ...66 ...
Page 70: ...68 Installation ...
Page 80: ...78 Installation ...
Page 86: ...84 Installation ...
Page 92: ...90 3 2 1 0 Installation ...
Page 99: ...97 ...
Page 103: ......