![OBO Bettermann SLM50 Mounting Instructions Download Page 13](http://html2.mh-extra.com/html/obo-bettermann/slm50/slm50_mounting-instructions_3176848013.webp)
13 | EN
SLM50 suspended vertical ladders for the maintenance of electrical function
Mounting vertical ladders up to a max storey height of 3 5 m
6 2 2
Mounting the ladder rails with a mounting bracket
Fig 7:
a
Drawing on the drill holes
Note!
Distance “a” is dependent on the width of the vertical ladder used.
a = vertical ladder width + 42 mm.
1. Draw on two drill holes at spacing “a” behind the ceiling opening.
Maintain the minimum edge spacing according to the approval of the
anchor used.
2. Using a linear laser, transfer the position of the drill holes to the floor.
3. Pre-drill the drill holes. Ø according to anchor type and approval.
Fig 8:
Mounting installation profiles
4. Mount the installation profiles with 1 M12 anchor on the ceiling and
floor.
– Mount the installation profiles with the short side on the ceiling and
floor.
– Mount the installation profiles with the long side inward.