background image

Sterizen

EN

7

X4 & X5 Install & Operation Manual

500475 v051120

Before Installation

Mounting

Due to it being battery operated the X4/X5 is a free standing model designed to fit in any space. Where it 

requires to be mains powered ensure there is a nearby power socket.

Before installation allow adequate space to install the appliance. Rear access is required to refill the unit or 

change the batteries.

1

2

The cabinet can then be levelled using the 4 

adjustable feet on the underside of the base.

Lay  down  the  cabinet  on  its  side  on 

a  soft  surface  to  avoid  scratching.  Fit 

the base to the underside of the unit 

and  fix  with  the  4  screws  provided. 

Note: Ensure the grommet is located to the 

rear of the unit.

Installation

Summary of Contents for ehanddryers Sterizen X4

Page 1: ...s 5 Electrical Diagram 6 Installation 6 Major Components 7 Before Installation 7 Mounting 8 Commissioning 9 User Instructions 9 Operation 9 Functions and Control 10 Maintenance 10 Refilling the X4 X5 Unit 11 Replacing the Batteries 12 Silicone Hose and Outlet 12 Stainless Steel Care 14 Fault Finding 15 Spares ...

Page 2: ...stand these instructions before starting work Please leave these instructions with the user following installation Particular attention should be paid to the section headed installation The hand sanitising station must not be sited outside or in any location where it could be exposed to the weather It must be installed in a dry environment In the Box X4 X4 Unit Base with fixing screws 4 x Adjustab...

Page 3: ...X4 X5 Install Operation Manual 500475 v051120 Sterizen EN 3 Technical Specification 360mm 353mm 1387mm 102mm 1110mm ø250mm X4 Dimensions ...

Page 4: ...Sterizen EN 4 X4 X5 Install Operation Manual 500475 v051120 360mm 710mm 1110mm ø250mm 353mm 1387mm 102mm Technical Specification X5 Dimensions ...

Page 5: ... EN 5 X4 X5 Install Operation Manual 500475 v051120 Technical Specification Electrical Diagram WIRE COLOUR LEGEND B R B R Red Black B R PCB R B 6V Pump R B PCB R B R B 6V Pump 6V Battery 6V Battery Barell Jack ...

Page 6: ...0475 v051120 Sterizen EN 6 Major Components 1 ACRYLIC PANEL 5 ADJUSTABLE FEET 2 DISPENSE OUTLET 6 SERVICE PANEL 3 TOP APERTURE 7 ACCESS PANEL LOCK 4 LOWER APERTURE 8 POWER JACK SOCKET Installation 1 2 3 5 8 4 7 6 Note Model shown is X5 ...

Page 7: ... socket Before installation allow adequate space to install the appliance Rear access is required to refill the unit or change the batteries 1 2 The cabinet can then be levelled using the 4 adjustable feet on the underside of the base Lay down the cabinet on its side on a soft surface to avoid scratching Fit the base to the underside of the unit and fix with the 4 screws provided Note Ensure the g...

Page 8: ...nit by unlocking the catch and then lifting up the cover NOTE PLEASE REFER TO PAGE 11 FOR FULL INFORMATION ON BATTERY OPERATION For first time use it is required to prime the pump so the sanitiser gel is close to the outlet To do this repeatedly place your hands under the sensor until the unit starts to dispense the sanitiser gel The unit is now ready for use Insert the provided batteries into the...

Page 9: ... touchless operation unit To operate you simply place your hands through the centre of either the top or bottom aperture to dispense the hand sanitiser A blue LED indicator will light up when in operation Function and Controls User Instructions Dispense Outlet Sensor Blue LED Indicator ...

Page 10: ...sily refilled To do so please follow the below instructions 1 3 2 Remove the rear access cover located at the rear of the unit by unlocking the catch and then lifting up the cover Fit rear panel back on and lock Remove silicone hoses and either replace the sanitiser containers or top up as required Insert the hoses back into the bottom of the containers ...

Page 11: ...e it is recommended that the batteries are removed from the unit Caution Replace batteries only with the same or equivalent type Danger of explosion if the batteries are incorrectly replaced 1 3 2 Correct disposal of the batteries in this product Applicable in countries with separate collection systems This marking on battery manual or packaging indicates that the batteries in this product should ...

Page 12: ...therefore requires the maintenance to be on a more frequent basis Modern processes use many cleaners sterilizers and bleaches for hygienic purposes All these proprietary solutions when used in accordance with makers instructions are safe but if used incorrectly e g warm or concentrated can cause discolouration and corrosion on the surface of any quality of stainless steel Strong acid solutions are...

Page 13: ...PF8017 acetone alcohol Rinse with clean water wipe dry if necessary Stubborn stains and discolouration Mild cleaning solutions i e Jiff Goddard Stainless Steel Care Rinse well with clean water wipe dry if necessary Rust and other corrosion products Oxalic Acid The cleaning solution should be ap plied with a swab and allowed to stand for 15 20 minutes before being washed away with water May continu...

Page 14: ...Leads attached Check power supply to pump No electricity power supply Check batteries and replace if necessary Check power cord is connected and live Blocked outlets pipes Check and unblock or replace as needed Sensor PCB not working Check replace control PCB Sanitiser lying in machine Leak from outlet Locate and repair accordingly Faulty sensor Locate and repair accordingly If you need further as...

Page 15: ...X4 X5 Install Operation Manual 500475 v051120 Sterizen EN 15 Spares 700859 700614 700693 700820 700840 700729 700885 700652 700842 ...

Page 16: ...Container Citrus Zest 500682 1L Refill Container Magenta Sky 700928 AC Mains Adapter 700899 Floor Fixing Kit Sterizen Part No Description 700614 6V Pump with Connector Joints 700693 Stainless Steel Outlet 700820 Outlet Locking Nut 700859 Control Board with Sensor and LED 700840 PCB Mounting Supports 700885 Emka Lock and Cam 700729 Rear Access Door 700842 Adjustable Feet x 4 700652 Base Plate 70083...

Reviews: