background image

Direct Service Done Right 

Since 1948, Nystrom has been the go-to manufacturer of specialty building products providing a wide range of floor, roof, wall, 
ceiling, and stair access products that create safer, more accessible buildings. We offer hassle-free services including access

 

to 

technical experts, REVIT tools for BIM, HPDs for LEED v4, 3-part specifications and AIA-accredited continuing education courses. 

©2022 Nystrom, Inc. 

Rev 05/22

 

 

Installation & Ope Maintenance 

alumaGRIL Entrance Grille 

Model: FL10LBM

 

3

 

 

Figure 1 

  

 

 

 
 

INSTALLATION 

 

INSTALL THE FRAME 

 

1.

 

Thoroughly sweep the substrate to remove all dirt and debris. 

2.

 

Place the assembled frame into the opening. Shim as necessary to level the frame to 
the final height of the finished floor surface. 

3.

 

Mark the fastening point locations on the frames. The required locations are indicated 
on the shop drawings. Otherwise, evenly space the fastening points at a maximum 
distance of 24

” 

on all sides of the frame. Drill and countersink 1/4" diameter holes at 

the marked locations.   

4.

 

Mark and drill 1/4"diameter holes in the floor for the anchors. 

5.

 

Line the frame members up with the holes and securely fasten the frame to the floor 
with the provided anchors. 

 

INSTALL THE DRAIN PAN

 (Optional) 

1.

 

Use a caulk gun to apply adhesive to the recessed surface medium. 

2.

 

Place precut drain pan sheets into recess. Apply pressure to all areas of the pan to aid 
in bonding. 

3.

 

Apply a silicone caulk to all drain pan seams where pan meets frame and where pan 
sections abut. 

 
 
 

Reviews: