
3
Assembly Instructions - February 2022
SPRAYHOOD by ACCESS
STEP
1
INSTALLING
THE ALUMINUM RAILS
Position the template
on the companionway and position the rails
on the template.
->Position the rails on either side of the companionway.
Mark the ten drill marks for each rail with a pencil.
Drill according to the marks (Ø 2mm drill).
Put silicone under the rails and in the holes to ensure a watertight seal.
Screw each rail according to the holes using the no.7 screws.
2
Place the white rail ends on either end of the rail
(see photo).
Mark the holes to be drilled with a pencil.
Drill using the Ø 2mm drill bit.
Put silicone under the ends and in the holes to
ensure a watertight seal.
Screw each rail end according to the holes using
the no.7 screws.
1