background image

 

 

OPERATION / MAINTENANCE 
 

****************************** IMPORTANT WARNING ****************************

 

This unit is using Lithium Iron Phosphate cell (LiFeP04)in its battery pack. These batteries require 
close monitoring and protection circuitry to operate safely. This pack uses a dedicated protection 
circuit board under the batteries sleeving meaning the protection is part of the battery pack in this 
case and not protection circuitry on the main PCB. The same ‘protected’ pack will be required when 
exchanging battery packs in the future during maintenance. 

 

 
 
TESTING FOR EMERGENCY LUMINAIRES 

Recommended routine test procedures in line with BS 5266 & BS EN 50172: 

 
Monthly Functional Test 

 

Simulate a mains supply failure by isolating the circuit (ensuring if it is safe to do so) or by way of a test key switch if 
fitted into the circuit. 

 

Do this for a period of time sufficient to check that the light source illuminates from the battery supply. 

 

Once complete, ensure the normal supply is restored & that the green LED charge indicator illuminates. 

 

Log result/comments in the Testing Log Book. 

 
Annual Discharge Test 

 

Simulate a mains supply failure by isolating the circuit (ensuring if it is safe to do so) or by way of a test key switch if 
fitted into the circuit. 

 

This should be for the full 3-hour rated duration. 

 

Check that the light source illuminates & remains illuminated for the full rated duration period. 

 

Once complete, ensure the normal supply is restored & that the green LED charge indicator illuminates. 

 

Log result/comments in the Testing Log Book. 

 

 
TESTING LOG BOOK 

Luminaire Type:   ……………………………… 

Luminaire Location/No.: 

………………………………... 

 

 

Installed By: 

 

……………………………… 

Installed Date: 

 

………………………..................... 

Contact Details:  ………………………………………………………………………………………………………………………….. 
 

 

………………………………………………………………………………………………………………………….. 

M ONTH

T EST

Signed

Date

Signed

Date

S igned

Date

Signed

Date

Signed

Date

1

FU NCTION AL

2

FU NCTION AL

3

FU NCTION AL

4

FU NCTION AL

5

FU NCTION AL

6

FU NCTION AL

7

FU NCTION AL

8

FU NCTION AL

9

FU NCTION AL

10

FU NCTION AL

11

FU NCTION AL

12

D ISC HA RGE

FIFTH YEAR

FIRST YEAR

SECOND YEAR

THIRD YEAR

FORTH YEAR

Reviews: