
1
CONTENTS
SECTION 1 INTRODUCTION
1.1. Purpose of the Service Manual
2
1.2. General Purpose
3
SECTION 2 OPERATING PRINCIPLES
2.1. General Overview
4
2.2. Explanations of Functions
4
2.2.1. Power Supply Values
4
2.2.2. Main PCB
4
2.2.3. Clontrol Panel
2.2.4. Water and Steam Unit
5
7
SECTION 3 SERVICING
3.1. General Overview
8
3.2. General Failure
9
3.3. Temperature Control Failure
SECTION 4 CALIBRATION PROCEDURE
4.1. How to Measure the Actual Temperature
4.2. Calibration
4.2.1. OT 020
4.2.2. OT 020 V
11
13
13
13
13
13
SECTION 5 SPARE PART REPLACING
4.1. Access to Command and Control
14
4.2. Replacing Main PCB
14
4.3. Replacing Display PCB
14
4.4. Replacing Temperature Sensor
14
4.5. Replacing Condense Selonoid Valve
14
4.6. Replacing Water Filling Solenoid Valve
15
4.7. Replacing Steam Discharge Solenoid Valve
15
4.8. Replacing Vacuum Line Solenoid Valve
15
4.9. Replacing Check Valve
15
4.10. Replacing Vacuum Pump
15
4.11. Replacing Water Pump
4.12. Replacing Safety Valve
4.13. Replacing Water Level Sensor
4.14. Replacing Heater
4.15. Replacing Plastic Panel
4.16. Replacing Locking Bobbin
4.17. Replacing Locking Switch
4.18. Cleaning the Sterilizator Chamber Filter
4.19. Replacing Pressure Switch
16
16
16
16
16
17
17
17
17
SECTION 6 DRAWINGS AND DIAGRAMS
6.1. Electric Circuit Diagram (OT 020)
6.2. Electrical Circuit Diagram (OT 020V)
19
20
6.3. Water and Steam Unit Diagrams
21
SECTION 7 SPARE PART LIST
Spare Parts List
29
Summary of Contents for OT 020
Page 19: ...18 SECTION 6 DIAGRAMS AND DRAWINGS ...
Page 20: ...19 6 1 ELECTRICAL CIRCUIT DIAGRAM OT 020 Figure 3 ...
Page 21: ...20 6 2 ELECTRICAL CIRCUIT DIAGRAM OT 020V Figure 4 ...
Page 22: ...21 6 3 WATER AND STEAM UNIT DIAGRAMS Figure 5 OT 020 flow diagram ...
Page 23: ...22 Figure 6 OT 020V flow diagram ...
Page 24: ...23 SECTION 7 SPARE PART LIST ...
Page 25: ...24 Figure 7 ...
Page 26: ...25 Figure 8 ...
Page 27: ...26 Figure 9 ...
Page 28: ...27 Figure 10 ...
Page 29: ...28 Figure 11 ...