INSTALLATION
OPTION #1 - UNDER CABINET ACCESS TO PIPING FROM BELOW

Refer to Figure 2

1.  Select a location under cabinet for VacPan™ (6) so that new fittings can be connected to existing pipe.  Drill small

reference hole under location of VacPan™ to determine position in basement or crawl space.

2.  Using a hole saw, cut access hole (3) in floor under cabinet.  Position access hole (3) so that final fittings (7) can be

installed by reaching through access hole (3).

3.  Cut 6 

3

/

4

" long slot along kick (4) of cabinet.

4.  Make terminal connections (5).

5.  Slide VacPan™ (6) into slot and secure using #6 painted wood screws provided.

6.  Reach through access hole (3) and make final fitting connections (7).

IF ACCESS CANNOT BE MADE FROM BELOW

1.  Rough-in pipe (8) through floor, 

provide 1/2" play in pipe.

2.  Provide slack in low voltage lines for future connection.

3.  Once cabinets are installed, cut access hole (13) and cover with 

cover plate

(14).  Reach through and make final

connections as per previous installation.

FIGURE 2

COVER ACCESS PLATE
(IF REQUIRED ACCESS CANNOT
BE MADE FROM BELOW)

KICKSPACE

FINAL FITTING
CONNECTIONS

VACPAN™

SUBFLOOR

JOIST SPACE

ALLOW 

1

/

2

" FLEX IN PIPE

TERMINAL
CONNECTIONS

HATCHED AREA 
REPRESENTS “ROUGH-IN” 
PIPING

ACCESS HOLE IN SUBFLOORING
UNDER CABINET

TO CENTRAL VAC

IF CEILING IS INSTALLED - PROVIDE COVER PLATE IN
BOTTOM OF CABINET TO MAKE FITTING CONNECTIONS.
(IF CEILING IS NOT INSTALLED, FINAL FITTING
CONNECTIONS CAN BE MADE THROUGH ACCESS HOLE IN
SUBFLOOR.

CABINET

7

4

6

5

3

8