
INSTALLING THE SWITCH
1. Install double-gang switch box in chosen location.
2.
Refer to Figure 6.
Run wiring and make wiring
connections.
3. Use supplied screws to secure switch bracket assembly
to switch box.
4. Using supplied screws, secure wall plate to switch bracket.
INSTALLING AND CONNECTING THE WIRING
Refer to Figure 6.
All wiring must comply with local codes and unit must
be properly grounded.
1. Using 12-gauge wire, run 120vAC, 60 Hz wiring (with
ground) from a power source to the wall switch location.
The unit must be wired on a separate 20 Amp circuit.
2. Run wiring from switch location to housing as shown in the
wiring diagram.
3. Make wiring connections as shown in wiring diagram.
4. Replace junction box cover. Slide slotted hole in cover over
screw. Tighten screw securely.
5. Secure wire cover with one screw.
6. Insert heater and ventilator plugs into proper receptacles
as shown.
FIGURE 6
HEATER
JUNCTION BOX
HEATER
(WHITE)
LIGHT
RED
WHT
BLK
WHT
BLK
WHT
NIGHT
LIGHT
SWITCH
BOX
LIGHT
HEAT
NIGHT
LIGHT
120vAC
LINE
GROUND
WHITE
BLACK
NOTE:
WHEN THERMOSTAT
OR TIMER IS USED,
CONNECT AT
T
T
3