JUMBO 7000 HFK SCISSOR
Nussbaum Automotive Solutions, LP | 1932 Jordache Court, Gastonia, NC 28052 | 704.864.2470 | Email:
19
•
From the mark establishing either the rear or front location of the platforms (whichever method used) draw
two, 3’ (900mm) arcs with the tape measure that intersect the 5’ (1500mm) arcs (created in 5.3.13). (Fig. 4)
•
Make marks at each of the intersections created by the arcs.
•
Snap a line connecting each of the marks (created in 5.3.15) This becomes the rear or front guideline for the
platforms. (Fig. 5)
•
Measure 15 ¾” on both sides of the “Bay Center Line” in two locations,
mark and snap two additional lines. These lines should run parallel with
each other and be exactly 31.5 inches apart. (Fig. 6) These lines become
the inner platform base guidelines.
•
For express lube and pickup lifting purposes, the platforms may be
distanced by 23”
-
31.5”
This procedure establishes the location for the exact
placement of the lift.
11.
LIFT INSTALLATION
11.1.
Unpack container and locate all pieces
(Figures 7 & 8)
Part
Quantity
Owner/Installation Manual
1
Hose Covers (left, right, control) 3
Main Control Station
1
Lifting Platforms
2
High density blocks
8(4 Large, 4 Small)
Hydraulic Hoses
1(Connected)
Platform Extensions
4
Platform Extension Bolts
8
[TR6]
Attention!
Report any shortages immediately
Figure 6
Figure 6