OPERATING INSTRUCTIONS
POSITIONING TOOL
FOR “TOP LOAD” SADDLES
code: 00IPOS01
ATTR MOD7 VER9USA IPOS
Page 1: ...OPERATING INSTRUCTIONS POSITIONING TOOL FOR TOP LOAD SADDLES code 00IPOS01 ATTR MOD7 VER9USA IPOS ...
Page 2: ...ght 15 lb Range of application 12EICOLTL142402 branch saddles 2 IPS for mains from 14 IPS to 24 IPS 12EIPRESTL142402 tapping tees with outlet 2 IPS for mains from 14 IPS to 24 IPS 12EIPRESTL142402 must be installed on pipes with the following SDR DN Pipe IPS Max wall thickness SDR 14 11 16 11 18 17 20 17 22 21 24 21 Don t install12EIPRESTL142402 on pipes with thickness greater than 1 55 Note Top l...
Page 3: ... article 12EIPRESTL142402 Make sure that the cap is competely tightened until the stop 3 Pass the belt under the pipe and insert it into the tightening clamp from the bottom to the top as showed on the figure Care not to move the fitting in order not to compromise the cleaning operation 4 Insert the belt up in the buttonhole and then pull down to tighten the top load saddle on the pipe ...
Page 4: ... than 1 mm only in this case proceed with the welding on the pipe Wait for the cooling time indicated on the bar code on the fitting 8 Remove the positioner by turning counterclockwise the handle and ex tract the belt from the tightening clamp NUPI AMERICAS Inc 1511 Superior Way Houston TX 77039 U S A ph 1 281 590 4471 fax 1 281 590 5268 Web Site www nupiamericas com E mail info nupiamericas com ...