
If you need advice, contact the Mitre 10 store
where you purchased your shed.
If you choose to vary from these
instructions your warranty will be impaired.
4
DIAGRAM 1
YOU WILL NEED
3 x 1830 x 780mm sheets
2 x 2255mm 'U' channels
YOU WILL NEED
3 x 1770 x 780mm sheets
2 x 2255mm U channels
2 x 1770mm L flashings
STEP 4
BACK WALL
Join the three sheets
C
together with 2 fixings through the overlapping
ribs, making sure the ends of the sheets are flush. Cap the sheeting with the
2255mm 'U' channels
F
.
Fix the channels through the end ribs and every second rib in between.
Make sure you put at least one fixing per sheet up through the underside
of the channel into the pan of the sheet.
STEP 5
ROOF
Join the sheets
D
together, same as the back. Cap the sheeting with the
2255mm 'U' channels
F
. Fix the channels at every second rib but not the
corners at this stage. Place the short flange of the first 'L' flashing
K
on top of
the rib at one end.
Make sure the ends are flush with the sheeting (diagram 1) and put one fixing in
the centre to hold the 'L' flashing. Fix the corners through the channels and one
more between the corner and the centre fixing. Perform the
same at the other end. Five fixings each 'L' flashing.
C
F
D
F
K
Put extra fixings in for high wind
areas, particularly on the underside.
NUMBER 8 TIP
F
F
K
K
D
F
F
C