Nucraft Crossbeam Installation Instructions Manual Download Page 8

Step 3: Work Surface Frame

Frames are made of 3 or 4 sections. Each section is labeled for correct placement.

Begin at one end, and work towards the opposite end. Place the u-slots of the frame in the channels 
of the vertical supports.

Secure when all sections are in place.

Vertical supports have 2 fastening locations:

Four HW1093 bolts in the u-slots. Keep these loose for adjustment. 

Two HW3717 set screws that will be used for leveling the frame.

Base extrusion and cross legs will have two HW1107 bolts and HW1094 nuts connecting the 
base to the frame.

Summary of Contents for Crossbeam

Page 1: ...Crossbeam Installation Instructions ID...

Page 2: ...nning Installation Read through the entire instruction thoroughly A minimum of 2 persons is required for this assembly These instructions reflect typical assemblies They may not match your specific co...

Page 3: ...Required Tools Drill Driver 2 Phillips Socket or Wrench Set Hardware HW1094 HW1093 HW3717 HW1107 HW0613 HW0565...

Page 4: ...Crossbeam...

Page 5: ...Crossbeam 1 Work Surface 2 Sub Top 3 Power Drawers 4 Frame 5 Access Panels 6 Cross Legs 7 Base Extrusion 8 Vertical Supports 1 2 3 4 5 6 7 8...

Page 6: ...nal location This half has the center cross leg and the stud weldment Place the floor core opening in correct relation to the floor core Slide the second half of the base onto the stud weldment Once b...

Page 7: ...t column will need to be added at the middle seam 216 size tables will use a square plate in this location It secures the same way The bottom plate of the support will align with the center stud weldm...

Page 8: ...ts of the frame in the channels of the vertical supports Secure when all sections are in place Vertical supports have 2 fastening locations Four HW1093 bolts in the u slots Keep these loose for adjust...

Page 9: ...et sub top onto frame The sub top outer cleats will sit around the frame If multi piece sub top join pieces together with the provided tite joint hardware Attach sub top to frame with HW0613 through t...

Page 10: ...Step 5 Level Frame Use a level on all three sections of frame Use set screws in the center of each vertical supports to make adjustments Then secure the 4 HW1093 on each vertical support u channel...

Page 11: ...rawer assembly will already be attached to the underside of the sub top Move the slide brackets past the magnets to allow the drawer box to click the back tab into place There is leveling at the back...

Page 12: ...orrect placement If applicable The first set will have brackets for the modular power system in place Panels attach with preinstalled monarch clips which hang on the frame stretcher bar brackets The b...

Page 13: ...f the table base The duplex brackets will already be in place Snap the duplexes into the bracket Connect the duplexes with jumpers Connect the plug in or hardwire infeed to the duplex or jumper neares...

Page 14: ...rix If applicable Power Matrix units attach to the underside of the sub top before the work surface is put in place Then use adjusters to flush the top of the of the power matrix door to the top surfa...

Page 15: ...finding the midpoint of each Then align those together Veneer and Laminate work surfaces will secure with HW0565 through the pilot holes on the underside of the sub top Glass Stone and Solid Surface w...

Page 16: ...panels will be labeled for correct placement Add second set of base panels by hanging the monarch clips on the panel to the brackets on the stretcher bars of the frame The brackets are able to adjust...

Reviews: