NuAire XB2-5 Installation And Maintenance Manual Download Page 9

Settings cont.

Setting the minimum trickle airflow (nominal 40%)

i) Repeat the same procedure as for maximum airflow above

but without the link wire between supply L and SL terminal.

Ensure the trickle switch is in the ‘ON’ position. Adjustment

must be made on the pot marked ‘Min’.

ii) Note that the minimum setting (nominally 40%) must be

below the maximum setting, otherwise minimum setting will

be automatically set to be the same as the maximum.

Setting the overrun time

A switched live of 100-230V at terminal SL will activate the

fan. When the switched live signal is removed the fan will 

overrun for period set by the dial ‘SL run on’ - adjust the

desired overrun time by rotating clockwise.

Setting the trickle ventilation facility

Slide the ‘trickle’ switch 0 = Off, 1 = On. With ’trickle’ on and

power to unit the fan will run at minimum speed until the

switch live signal activates it to boost.

Setting the ‘air off’ temperature

The adjustment knob is located in the control pack and must 

be set to the desired ‘air off’ temperature.

9

25. 01. 17. Leaflet Number 671440

 

Installation and Maintenance

XBOXER (XB2-5)

4.0 Wiring - for units supplied 

without Ecosmart Control

The wiring illustrations below are for the fans, bypass damper

and electric heater for units without control. 

All wiring is terminated in junction boxes fitted to the specified

side of the unit.

It is the installer’s responsibility to select and fit the appropriate

control equipment to produce the desired output.

Note that any heating/cooling coils fitted are supplied 

without control valve and actuator.

Electrical Details

Fan motor 

Electric heater 

ratings

ratings (if fitted)

Unit size  flc 

sc 

kW 

flc

XB2

2 x 0.75A 

2 x 3A 

4.5kW 

18.7A

XB3

2 x 0.75A 

2 x 3A 

4.5kW 

18.7A

XB4

2 x 1.2A 

2 x 4.8A 

4.5kW 

18.7A

XB5

2 x 1.2A 

2 x 4.8A 

4.5kW 

18.7A

Bypass damper rated at 3W, 13mA for all unit sizes.

EAR

TH

NEUTRAL

LIVE

FAN 1

Isolator 

by others

L

L

230V-50Hz

Fuse

3A  (T)

(Unit sizes XB2-5) Fan wiring. 

Two per unit and one per blower.

(Unit sizes XB2-5T) Fan wiring. 

Three per unit and one per blower.

Isolator 

by others

L

L

230V-50Hz

L

230V-50Hz

L

Isolator 

by others

Bypass Dam

per

P

ow

er t

o open

A

ut

o Close

Electr

ic Heat

er

Ther

mal Ov

er

load

Connection t

Electr

ic Elements

(Unit sizes XB2-5) with electric heater 

bypass damper and electric heater

wiring.

(Unit sizes XB2-5) Fan only or

with LPHW coil bypass damper

wiring.

L

230V-50Hz

Isolator 

by others

Bypass Dam

per

P

ow

er t

o open

A

ut

o Close

L

Figure 19.

MIN 

=  Minimum speed adjustment

MAX 

=  Maximum speed adjustment

SL Run on 

=  Switched Live Run-On 

    Timer adjustment

TRICKLE 

=  Selects trickle running:  

    0 = off,  1 = selected

TEST 

=  Test button

LED indicators

Min         Max    SL run on

Trickle

Test

0  

1

Pwr

Standby

Fan 1

Fan 2

Heating

Cooling

Fault

Frost

TX

RX

Connector

Ecosmart

Figure 20.

Figure 21.

Figure 22.

Summary of Contents for XB2-5

Page 1: ...in strict accordance with the applicable Building Regulations The fan must be fitted indoors on a secure surface away from sources of water spray or steam generation The side access unit shall be cons...

Page 2: ...ay be required dependant on installed conditions B Condensate tray regular maintenance required C Heater Other components are unlikely to need attention on a regular basis D Supply Filter Access space...

Page 3: ...e fan i e under negative pressure then calculate the values of A B as shown below and see fig 11 A Fan inlet pressure mm H2O 25mm minimum Allow 100mm for these units if pressure is unknown B A 2 minim...

Page 4: ...unction box product code ES JB should be used see data cable installation Switch Live SL terminal A signal of 100 230V a c will activate the fan required at each control Note that a signal from an iso...

Page 5: ...if switched live signal an enabler or BMS signal is connected continued on page 6 d Data Cable Installation A 4 core SELV data cable is used to connect devices Do not run data cable in the same condu...

Page 6: ...the essential field wiring points for clarity Remove link wire if switched live signal an enabler or BMS signal is connected Wiring Unit sizes XB2 5 with Ecosmart fan and LPHW coil control Figure 15 2...

Page 7: ...signal an enabler or BMS signal is connected Ecosmart Ecosmart Wiring Unit sizes XB2 5T with Ecosmart control and electric heater Figure 17 Wiring Unit sizes XB2 5T with Ecosmart fan only control Fig...

Page 8: ...Setting the maximum air flow ii Ensure the power supply is switched off and that a link wire is connected from the supply L to the SL terminal Unplug all items connected to the Net connectors ii Swit...

Page 9: ...nction boxes fitted to the specified side of the unit It is the installer s responsibility to select and fit the appropriate control equipment to produce the desired output Note that any heating cooli...

Page 10: ...x and Sensors if fitted Remove covers and carefully clean out interiors as necessary Check for damage and security of components Refit covers 6 0 Replacement of Parts Should any component need replaci...

Page 11: ...iate standard must be fitted 5 2 The electrical installation of the equipment must comply with the requirements of the relevant local electrical safety regulations 5 3 For EMC all control and sensor c...

Page 12: ...12 25 01 17 Leaflet Number 671440 Western Industrial Estate Caerphilly United Kingdom CF83 1NA T 029 2085 8200 F 029 2085 8300 E ahu nuaire co uk W www nuaire co uk...

Reviews: