NuAire OPUS 30 Installation And Maintenance Manual Download Page 4

Installation and Maintenance  

OPUS ( M range )

4

N

L

N

L

Switch

Room light

Room light

1

N

L

Switch

M Unit ventilating one room.

M    Unit ventilating two rooms.

2MAS Unit ventilating one room, (no run on timer).

Fuse

2 Amp max

Fuse

2 Amp max

C

C

Electrical Diagrams

N

L

Switch

Room light

3

1

N

L

2

Fuse

2 Amp max

C

MS  Unit ventilating one room.
(using run on circuit).

3

1

N

L

2

3

2

1

N

L

N

L

Room light

Fuse

2 Amp max

C

MX    Continuous run with boost (Opus 30).

1

N

L

2MAS  Unit ventilating one room(using run on circuit).

N

L

Switch

Room light

Remote fail LED

Remote fail LED

3

1

N

L

2

Fuse

2 Amp max

C

MS  Unit ventilating two rooms (using run on circuit).

2MAS Unit ventilating two rooms (using run on circuit).

2MAS Unit ventilating two rooms (no run on timer).

Wiring details for remote  indicator.

Fan terminal block

Remote 
indicator panel

N

L

Fuse

2 Amp max

Switches (double pole)

Room light

C

C

1

N

L

1

N

L

N

L

Fuse

2 Amp max

Switches 

(double pole)

Room light

C

C

Remote fail LED

N

L

Fuse

2 Amp max

Switches

(double pole)

Room light

C

C

3

1

N

L

2

3

1

N

L

2

Remote fail LED

N

L

Fuse

2 Amp max

Switches 

(double pole)

Switch 

(double pole)

Model

Unit Code

Unit input power (watts)

Full load running current (amps)

*Starting current (amps)

* On starting both fans run together

Opus 30

Opus 60

M

26

0.170

0.215

MX  on

boost

26

0.170

0.215

2MAS

26

0.170

0.215

M

58

0.190

0.280

2MAS

58

0.190

0.280

Room light

C

C

Reviews: