5
17. 11. 21. Document Number 671861
Nuaire | Western Industrial Estate | Caerphilly | CF83 1NA | nuaire.co.uk
MRXBOXAB-ECO3-AE(OH)SW & MRXBOXAB-ECO5-AE(OH)(SC/SW)
Installation Manual
3.7.1 Pre Commissioning MRXBOX MVHR Units
MRXBOX units are designed to ventilate the whole dwelling and must
not be used during site construction or the clean-up period. Cement
and plaster dust can be abrasive and can affect fan performance
and reliability. Please ensure that the filters are checked prior to
commissioning to ensure there is no build-up of dust or debris.
While the property is drying out, very high moisture levels are likely
to occur. Therefore it is advisable that if the installation and building
works are complete the unit is left running. If the building works are
not complete please close the air valves or cover up the air valves to
prevent condensation forming in the ductwork and the MRXBOX unit
due to natural migration of warm air.
3.8 Dimensions
11
Unit Dimensions
754
5
2
7
525
55
227 CR S
155
458 CR S
=
=
Ø150.0
UNIT WEIGHT = 56Kg
If ancillary distribution box (DB-ECO3) is to be used refer to documentation
supplied with DB-ECO3 for additional infomation as requirements will differ.
107
107
N
N)
Condensate drain
connection
(opposite hand
configuration)
Condensate drain connection
on centre line of unit
Condensate drain connection
(standard configuration)