5.0  Ancillaries

Remote Fail Indicator: 

MRXBOX95LH-RFI

Loft Stand: 

MVHR-LOFT-STAND 

(see figure 10).

If the unit needs to be raised in the loft space, then a stand

should be used.

The four ‘L’ shape brackets should be fitted to the main unit and

this in turn should be bolted to the stand. Place the additional

AV pads on to the stand before bolting to the stand using the

pre inserted holes (Please refer to section 2 to ensure the 

correct fitting of the ‘L’ shaped brackets).

6.0 Commissioning

1.

For the required airflow rates refer to the design 

specification for the property or refer to Building 

Regulations Part F.

2.

The unit is supplied with control of both the normal 

airflow and boost airflow. (see figure below).

3.

Commissioning should be carried out using a moving 

vane anemometer in conjunction with a hood.

4.

Once commissioned the house owner / tenant should 

be informed that the unit should not be adjusted as it 

will have a detrimental effect on the indoor air quality 

and could result in condensation and mould growth.

7.0 Maintenance/Cleaning

Please allow 300mm each side of the unit to allow access for 

maintenance purposes. 

1.

Replace filters every 5 years. 

Remove the top cover and 

slide out the two G4 filters fitted either side of the heat 

exchanger. Replace with new filters.

2.

Inspect heat exchanger every 5 years.

Generally check for

damage and security of components. Refit top cover.

3.

Inspecting motors.

Motors can be accessed through 

removal side panels.

8.0 Replacement of Parts

Should any component need replacing Nuaire keep extensive

stocks for quick delivery. Ensure that the unit is electrically 

isolated, before carrying out any work. 

When ordering spare parts, please quote the serial number of

the unit and the ARC number of the purchase if possible.

(This information will be available on the fan label).

9.0 Warranty

The 5 year warranty starts from the day of delivery and

includes parts and labour for the first year and parts only for

the remaining 4 years. This warranty is conditional on planned

maintenance being undertaken

.

10.0 Service Enquiries

Nuaire can assist you in all aspects of service. Our service 

department will be happy to provide any assistance required, 

initially by telephone and If necessary arrange for an 

engineer to call.

Technical Support

029 2085 8400

6

14. 02. 14. Leaflet Number 671496

Figure 11. Detail of unit control on side panel.  

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

Boost

Extract

Fan

Supply

Fan

Fan

Failure

+

_

+

_

+

_

For commissioning

refer to user manual

Ventilation controls

Continuous
background

Power

Figure 12. Removing filters. 

Installation and Maintenance

MRXBOX95-LH1/LH2 Mechanical Ventilation with Heat Recovery

Technical or commercial considerations may, from time to time,

make it necessary to alter the design, performance and 

dimensions of equipment and the right is reserved to make such

changes without prior notice.

Figure 10. MVHR-LOFT-STAND.

Summary of Contents for MRXBOX95-LH1

Page 1: ...l is towards the drip tray end of the unit see figures 2a 2b and 2c for fixing details Lower the unit with the L shape fixing brackets attached onto the joists Mark through the brackets and drill four...

Page 2: ...is secure 1 Cut the pipe to length allowing for the full compression socket depth using an appropriate pipe cutter such as a Hepworth rachet pipe cutter 2 Remove any swarf from the end of the plastic...

Page 3: ...upply and extract air grilles should be at least 300mm apart Figure 4 Typical MVHR ducted arrangement for a loft mounted unit using the Nuaire condensation trap 125mm dia CONTRAP 125 2 3 Extract input...

Page 4: ...W FROM TOP Condensate Drain 21 5mm dia condensate drain 21 5mm dia condensate drain alternative position SIDE VIEW controls 3 0 Dimensions mm Figure 6 Figure 5 Main unit components shown with front an...

Page 5: ...tray as other cables 4 0 Electrical Connection Please note the electrical connection of the unit must be be carried out by a qualified electrician The unit is supplied with a flexible cord for connec...

Page 6: ...changer Replace with new filters 2 Inspect heat exchanger every 5 years Generally check for damage and security of components Refit top cover 3 Inspecting motors Motors can be accessed through removal...

Page 7: ...hen handling the equipment care should be taken with corners and edges and that the weight distribution within the unit is considered Lifting gear such as slings or ropes must be arranged so as not to...

Page 8: ...F83 1NA T 029 2085 8400 F 029 2085 8444 E info nuaire co uk W www nuaire co uk Technical or commercial considerations may from time to time make it necessary to alter the design performance and dimens...

Reviews: