Installation and Maintenance

ECOSMART Squrbo Fans

4.0 Setting to Work

Using the Test Button

The test button allows the individual blowers within the unit to be

checked for its operation. If the fan is running already, press the

button once to stop the fan, press again to switch on the fan. 

Note that the fan will return to normal operation after 

30 seconds.

LED Indication

PWR

GREEN: Power on & OK,   

Standby LED on when fan is not running.

Fan 1

GREEN: Fan 1 is running, RED: Fan 1 faulty.

Fan 2

GREEN: Fan 2 is running, RED: Fan 2 faulty.

Heating* GREEN: Heating selected RED: Heating faulty.

Cooling* Not applicable. See note.

Fault

LED on when a fault is present on unit.

Frost alarm - contacts close when air off temperature is 4

0

or below. Fan shuts down, valve opens and the heat demand

contacts activated.

Tx

LED on when the controller is transmitting data.

Rx

LED on when the controller is receiving data.

* Note that the control panel is common to all the Ecosmart

products and will have indicators for functions that are not

available in this particular fan. However these indicators will

not be illuminated.

BMS Input Signals

The system’s response to a 0-10V dc BMS signal is given in the 

following table. 

Note the BMS signal will override any sensors and user control 

connected in the system. The voltage tolerance is +/_ 125mV

and is measured at the fans terminal.

Ventilation mode

Cooling mode*

Heating mode*

Local control 0.00

-

-

OFF / trickle

0.25

-

-

Speed 1

0.50

0.75

1.00

Speed 2

1.50

1.75

2.00

Speed 3

2.50

2.75

3.00

Speed 4

3.50

3.75

4.00

Speed 5

4.50

4.75

5.00

Speed 6

5.50

5.75

6.00

Speed 7

6.50

6.75

7.00

Speed 8

7.50

7.75

8.00

Speed 9

8.50

8.75

9.00

Speed 10

9.50

9.75

10.00

* Only available on relevant unit

Settings

Setting the maximum air flow

ii) Ensure the power supply is switched off and that a link wire is

connected from the supply L to the SL terminal. Unplug all items

connected to the ‘Net‘ connectors.

ii) Switch on the power supply.

iii) Wait for the fan to complete its self-test operation.

Measure the airflow using standard commissioning instruments at

a suitable point in the ductwork. If adjustment is required, rotate

the pot marked ‘MAX’ to obtain the desired airflow

.

Setting the minimum trickle airflow (nominal 40%)

i) Repeat the same procedure as for maximum airflow above but

without the link wire between supply L and SL terminal. Ensure the

trickle switch is in the ‘ON’ position. Adjustment must be made on

the pot marked ‘Min’.

ii) Note that the minimum setting (nominally 40%) must be below

the maximum setting, otherwise minimum setting will be auto-

matically set to be the same as the maximum.

Setting the overrun time

A switched live of 100-230V at terminal SL will activate the fan.

When the switched live signal is removed the fan will overrun for

period set by the dial ‘SL run on’ - adjust the desired overrun time

by rotating clockwise.

Setting the trickle ventilation facility

Slide the ‘trickle’ switch 0 = Off, 1 = On. With ’trickle’ on and power

to unit the fan will run at minimum speed until the switch live 

signal activates it to boost.

Setting the ‘air off’ temperature

The adjustment knob is located in the control pack and must be set

to the desired ‘air off’ temperature.

Figure 9.

MIN 

=  Minimum speed adjustment

MAX 

=  Maximum speed adjustment

SL   

Run on 

=  Switched Live Run-On  

    Timer adjustment

TRICKLE  =  Selects trickle running:   

    0 = off,  1 = selected

TEST 

=  Test button

LED indicators

Min         Max     SL run on

Trickle                        Test

0        1

Pwr

Standby

Fan 1

Fan 2

Heating

Cooling

Fault

Frost

Tx

Rx

Ecosmart

Connector

Isolation - Before commencing work make sure

that the unit, and Nuaire control are 

electrically isolated from the mains supply.

Summary of Contents for Ecosmart Squrbo Series

Page 1: ...125 150 150 330 140 115 7 4 ESS2 ESSE2 185 302 630 150 150 150 330 140 150 8 1 ESS3 ESSE3 235 350 700 200 150 150 330 140 170 13 0 ESS4 ESSE4 285 350 672 250 150 150 330 140 170 13 8 ESS5 ESSE5 350 40...

Page 2: ...ions These contacts are closed when the fan is running Fault connections No fault the contacts are closed Fault the contacts are opened Heat demand contacts closed when heating is selected d Data Cabl...

Page 3: ...rost Tx Rx Ecosmart Heat demand signal L N E 230V 50Hz 1ph mains Earth Run signal Fault signal HEAT DAMPER DEMAND 0V 0 10V BMS signal Speed Controller Connections to Damper FAULT RUN N L SL DP CL N RE...

Page 4: ...evant unit Settings Setting the maximum air flow ii Ensure the power supply is switched off and that a link wire is connected from the supply L to the SL terminal Unplug all items connected to the Net...

Page 5: ...end on the site conditions Note It is important to allow sufficient time for the heater battery to cool down before beginning work Cleaning Control Box and Sensors if fitted Remove covers and carefull...

Page 6: ...product the following general requirements should be noted 5 1 Where access to any part of equipment which moves or can become electrically live are not prevented by the equipment panels or by fixed...

Page 7: ...7 21 10 16 Leaflet Number 671169 Notes...

Page 8: ...8 21 10 16 Leaflet Number 671169 Western Industrial Estate Caerphilly United Kingdom CF83 1NA T 029 2085 8400 F 029 2085 8444 E info nuaire co uk W www nuaire co uk...

Reviews: