
Document # CSM001 Revision Date: August 9, 2016
Page
4
of
48
1
ABOUT THE H/ERV
The heat recovery ventilator (HRV) provides fresh air to a conditioned space while
exhausting an equal amount of stale air. Heat energy is transferred from one air
stream to the other within a non-contact cross flow heat exchanger. ERV models
transfer latent energy (moisture) from the higher to lower air stream.
A.
Two fan motor sets deliver fresh air into the space and exhaust stale air from the
space.
B.
Incoming fresh air is filtered before flowing through the heat exchange core.
C.
Stale air flows through the cross-flow heat exchanger and transfers the heat
(HRV) (and moisture (ERV)) to the incoming fresh air.
D.
Warm fresh air is distributed through an independent ductwork system or an
existing air distribution system.
Summary of Contents for NU0820
Page 12: ...Document CSM001 Revision Date August 9 2016 Page 12 of 48 ...
Page 13: ...Document CSM001 Revision Date August 9 2016 Page 13 of 48 5 2 NU1030 ...
Page 14: ...Document CSM001 Revision Date August 9 2016 Page 14 of 48 5 3 NU2035 ...
Page 15: ...Document CSM001 Revision Date August 9 2016 Page 15 of 48 5 4 NU2540 ...
Page 16: ...Document CSM001 Revision Date August 9 2016 Page 16 of 48 5 5 NU0820 Curb ...
Page 17: ...Document CSM001 Revision Date August 9 2016 Page 17 of 48 5 6 NU1030 and NU2540 Curb ...
Page 30: ...Document CSM001 Revision Date August 9 2016 Page 30 of 48 ...
Page 31: ...Document CSM001 Revision Date August 9 2016 Page 31 of 48 ...
Page 32: ...Document CSM001 Revision Date August 9 2016 Page 32 of 48 ...
Page 33: ...Document CSM001 Revision Date August 9 2016 Page 33 of 48 ...
Page 34: ...Document CSM001 Revision Date August 9 2016 Page 34 of 48 ...
Page 35: ...Document CSM001 Revision Date August 9 2016 Page 35 of 48 ...
Page 36: ...Document CSM001 Revision Date August 9 2016 Page 36 of 48 ...
Page 37: ...Document CSM001 Revision Date August 9 2016 Page 37 of 48 ...
Page 38: ...Document CSM001 Revision Date August 9 2016 Page 38 of 48 ...
Page 39: ...Document CSM001 Revision Date August 9 2016 Page 39 of 48 ...