
Boiler Location
│
Tx I&O Manual
8
Figure 3-1 Closet Installation, Minimum Clearances
(Non-Combi Model Shown)
Ventilation Air Openings
are not required if the
boiler area meets the
Recommended
Clearances
listed in Table 3-1.
Bottom ventilation opening
Max. 6” above floor / bottom
Top ventilation opening
M
ax. 6” below ceiling / top
Sides = 4”
Front =
6”
(if removable)
Removable surface /
closet door
Ventilation air opening
1in
2
per 1000 Btu/hr,
min. 100in
2
Ventilation air opening
1in
2
per 1000 Btu/hr,
min. 100in
2
Min. 1” clearance for hot
water and vent pipes
Bottom = 9”
Top = 12”
Summary of Contents for Trinity TX101
Page 54: ...Field Wiring Tx I O Manual 54 Figure 12 2 Field Wiring ...
Page 57: ...Tx I O Manual Wiring Schematics 57 14 0 WIRING SCHEMATICS Figure 14 1 Tx Connection Diagram ...
Page 58: ...Wiring Schematics Tx I O Manual 58 Figure 14 2 Tx Ladder Logic Diagram ...