NTI Trin & Stor ST Series Installation And Operation Instructions Manual Download Page 10

 

Trin & Stor

 

 

Installation and Operation Instructions                                               Storage Tanks                                                                            

 

 

 

10 

4.0  START UP AND CHECK OUT 

Operational Checklist 

 

1.

 

Ensure all electrical connections are made correctly and no high voltage wires are exposed. 

2.

 

Ensure the Tank Sensor is correctly installed, and the Trinity Lx Water Heater is correctly reading the tank 
temperature. In lieu of the Tank Sensor ensure the Thermostat demand is properly signaling the boiler to 
operate.    

3.

 

Set the Water Heater to the desired temperature. 

4.

 

Ensure piping system is free of leaks and that air has been purged from system. 

5.

 

Initiate a call for hot water by opening hot water taps on domestic water fixtures.   

6.

 

Verify that the water heater and recirculation pump starts when the tank temperature drops below the 

“Demand On temperature” and shuts down when the tank temperature rises above the “Demand Off 

temperature”. See Figure 3-2. 

7.

 

Check for proper operation of relief valve by opening it manually. 

8.

 

If relief valve functions continuously during normal operation, the expansion tank may need to be upsized. 

 
 

 

5.0   ANNUAL MAINTENANCE AND INSPECTION 

Inspection Checklist 

 

1.

 

Perform a visual inspection of all valves, drains, and system piping for signs of leaks.  

 

Maintenance Checklist 

 

1.

 

Verify maximum water temperature at hot water fixtures to verify mixing valve temperature settings.  

2.

 

Manually operate T&P relief valve by moving lever to open position until hot water is released and allow it to 
snap close. If closed relief valve continues to leak, close cold water inlet, drain tank, and replace relief valve.  

3.

 

If relief valve functions continuously during normal operation, the expansion tank may need to be upsized. 

4.

 

Ensure the water heater and/or solar thermal system is maintained in accordance with its installation manuals. 

5.

 

Check function of field-installed controls, thermostats, and circulators. 

6.

 

Check tank PH and chloride levels to determine if water chemistry is within the specified range.  

7.

 

Any additional procedures required by local codes. 

 

Draining the Storage Tank 

1.

 

Disconnect the power supply to the heat source. 

2.

 

Purge hot water from the tank by opening a hot water faucet. 

3.

 

Close the cold water supply shut off valve. 

4.

 

Open the drain valve and divert water in tank to alternate storage location or floor drain. 

5.

 

Open highest hot water faucet to allow air to enter the system.  

 
 

 

6.0   PARTS LIST 

Table 6-1

  

Storage tank

 

Item 

Part # 

Models 

Description 

 

 
 

Installers  requiring 
technical  assistance 

can contact NTI directly at 1-800-688-2575. 

84156 

ST80, ST120 

Relief Valve, T&P, ¾", 150 psi 

84632 

ST80, ST120 

Tank Sensor 

84158 

ST80, ST120 

TPI Control Thermostat  

 

 

 

 

 

 
 

 

 
 
 
 
 
 

Summary of Contents for Trin & Stor ST Series

Page 1: ...ND DEFINITIONS Danger Sign Indicates a hazardous situation which if not avoided will result in serious injury or death Warning Sign Indicates a hazardous situation which if not avoided could result in...

Page 2: ...cannot supervise the installation and therefore makes it a specific condition for the warranty that the customer will supervise the installation and use of the product to be sure they are performed i...

Page 3: ...et be cool enough to prevent scalding Since both hazards present a potential risk to the user they must be monitored and controlled Table 1 4 indicates how water temperature affects Legionella bacteri...

Page 4: ...y or death This appliance is not intended to convey or dispense water for human consumption such as drinking or cooking Legislation and Guidelines At the time this document was written standards and g...

Page 5: ...TI warranty and may result in property damage Storage Tank Piping Tank connection ports are identified in Figure 2 1 and dimensioned in Tables 2 3 and 2 4 and their function is described in detail bel...

Page 6: ...tank is mandatory not optional and must be installed downstream of any device used to control system thermal expansion When using multiple storage tanks check if a single BFP is required on the domes...

Page 7: ...of being blocked or capped 13 Verify with local codes if a backflow preventor or thermal expansion control device is required 14 Install a domestic expansion tank downstream of the backflow preventor...

Page 8: ...series water heaters that are wired together as part of a multiple water heater cascade i e when they are Lead Lagged together When using a Trin Stor Storage tank with a cascade water heater system t...

Page 9: ...t set to the desired Water Heater operating temperature during a DHW demand should be set higher than the Demand Off temperature Typical setting 130 F to 190 F 4 Demand On temperature tank temperature...

Page 10: ...tenance Checklist 1 Verify maximum water temperature at hot water fixtures to verify mixing valve temperature settings 2 Manually operate T P relief valve by moving lever to open position until hot wa...

Page 11: ...Storage Tanks Installation and Operation Instructions Trin Stor 11 NOTES...

Page 12: ...tor Installation and Operation Instructions Storage Tanks 12 NY Thermal Inc 30 Stonegate Drive Saint John NB E2H 0A4 Canada Technical Assistance 1 800 688 2575 Website www ntiboilers com Fax 1 506 432...

Reviews: