NTC RZ113 Operation Manual Download Page 15

Asphalt and concrete cutters 

Operation manual 

Page 

15 

issued 01/2017 

4.2.2.  Fastening of the Cutting Disc

1.  Turn off the engine and open the disc cover.  
2.  Use  the  enclosed  wrenches  to  hold  the 

spindle  and  unscrew  the  fastening  nut. 
NOTE: Left thread!  

3.  Fit the cutting disc on the spindle and secure 

it.  

4.  Close the disc cover and secure it. 

 

 

4.2.3.  Cutting 

1.  Have  the  disc  raised  above  floor.  Start  the 

engine and set full throttle.  

2.  Open the water tap to engage sprinkling.  
3.  Move  the  machine  to  the  beginning  of  the 

cut.  

4.  Lower  slowly  the  disc  into  the  cut,  till 

required cutting depth is reached.  

5.  Sensitively  push  the  machine  forward  and 

follow the marked path (use the guide).  

6.  The  machine  can  only  cut  in  straight 

direction.  In  case  the  direction  must  be 
changed,  raise  the  disc  from  the  cut,  take 
new direction and lower the disc again.  

7.  At  the  end  of  the  cut,  raise  the  disc,  set the 

throttle to idle. 

NOTE!  The  cutting  disc  should  be  sprinkled 
all  the  time.  Follow  the  water  level  in  the 
tank and timely add water as necessary. Dry 
cutting may cause fast damage to the disc.  

For  optimal  service  life  of  the  cutting  disc,  the 
operator  should  work  carefully  and  sensitively. 
Do not force the machine! 
Nevertheless,  lifetime  of  the  disc  may  vary 
depending  on  the  material  to  be  cut  and  other 
factors. 
 

4.2.4.  Cutting Depth Scale 

Cutters  RZ  113  and  RZ123  have  just 
informative  cutting  depth  scale.  Turning  the 

handle  for  360  degrees  lowers  the  blade  for 
about 15 mm. 

4.3.  Engine Turning-Off 

1.  Shift  the  throttle  control  lever  to  idle 

position. (see point 4.1.1.4). 

2.  Let  the  engine  to  idle  for  a  while  to  cool 

down.  

3.  Turn the ignition switch to  "OFF". 
4.  Close the fuel tap 
 

 

Summary of Contents for RZ113

Page 1: ...ANUAL ASPHALT AND CONCRETE CUTTERS RZ113 RZ123 version 01 2017 NTC STAVEBN TECHNIKA spol s r o Ji inkov 120 552 03 esk Skalice Czech Republic Tel 420 491 452 184 fax 420 491 401 609 E mail ntc ntc cz...

Page 2: ...tc The machine is driven with four stroke single cylinder engine HONDA net power GX160 3 6kW GX200 4 1kW V echna p slu n ustanoven Strojn za zen sm rnice 2006 42 ES NV 176 2008 Sb kter v robek spl uje...

Page 3: ...etherlands Italy Hungary Romania and Russia NTC has certified quality control system according to ISO 9001 2008 All manufactured models undergo testing measuring and consideration of safety risks all...

Page 4: ...6 4 4 1 Manual Handling 16 4 4 2 Handling by Crane 16 4 4 3 Handling by Forklift 16 4 4 4 Transport 16 4 4 5 Storing 16 4 5 SPECIAL CONDITIONS OF OPERATION 16 4 5 1 Work at Low Temperatures 16 4 5 2 W...

Page 5: ...rrange his training ensure safe working conditions inspect attendance of the safety regulations inspect that the operator works with the machine in accordance with the Operation Manual ensure regular...

Page 6: ...caused with contact with an obstacle 14 Do not smoke do not use naked flame Do not work close to flammables or in explosion danger areas 15 Avoid touching hot parts The exhaust silencer and other par...

Page 7: ...when refueling 1 3 Hygienic principles Oil derivates fuel lubricants as well as paints and thinners are harmful agents Anyone who gets into contact with such agents is obliged to protect himself and f...

Page 8: ...A G dB As measured by NV no 9 2002 Coll Annex no 3 section B paragraph 31 respectively in accordance with Directive 2000 14 EC Annex III Part B item 30 and EN ISO 3744 2010 107 4 105 4 Acceleration tr...

Page 9: ...tion Symbol no 7 28 orders the operator to read the manual prior to starting the operation Safety mark symbol no NB 2 26 orders the operator to use protective gloves during the operation to reduce vib...

Page 10: ...ECHNICAL DESCRIPTION The asphalt and concrete cutters RZ are intended for cutting of asphalt and concrete floors or road layers when repairing roads industrial areas etc The machine is based on a rigi...

Page 11: ...M 3600 3600 Oil sensor yes yes Fuel consumption ltr hr 1 4 1 7 Engine output is mentioned according to SAE 1349 Actual output of the engine installed in the machine can be different with regard to var...

Page 12: ...e matrix arm guidance are glued Screws at the pulleys the drive chassis are tight and prescribed the query moment We therefore recommend against any potential activity associated with permitting and t...

Page 13: ...er 91 or more Top up fuel as necessary Never use dirty fuel or mixture with oil Avoid water and dust from entering the fuel tank 3 4 Check Air Filter Check the air filter for cleanness on a daily basi...

Page 14: ...sition DANGER The spindle and the cutting disc begins to rotate immediately Be sure that the revolving disc would not cause any danger for the bystanders Have the disc cover closed before starting 4 2...

Page 15: ...case the direction must be changed raise the disc from the cut take new direction and lower the disc again 7 At the end of the cut raise the disc set the throttle to idle NOTE The cutting disc should...

Page 16: ...sition If overturning happens see point 3 5 4 4 5 Storing Store the machine on a safe place secured from theft and misuse We recommend an indoor dry place without excessive concentration of chemical a...

Page 17: ...mation to an authorized service center or manufacturer 5 1 Maintenance of the Engine see enclosed Engine Operation Manual 5 2 Tensioning of the Drive Belts check regularly tensioning of the drive belt...

Page 18: ...on Initial inspection After 1st month or 20 hrs Every 3 months or 50 hrs Every 6 months or 100 hrs Engine oil Inspection of oil level DAILY Exchange Air filter Inspection Cleaning 1 Spark plug gasolin...

Page 19: ...e machine is in warranty write date of purchase and let the serviceman know it is a warranty case 4 Warranty claim needs to be done in written form best if Warranty claim form is used 5 Every warranty...

Page 20: ...ne sale date Machine purchased from NTC dealer Dealer Machine owner adress phone no contact person Machine operation site if different from owner s address Please send properly filled protocol by fax...

Page 21: ...Warranty claim assessment YES NO Reason Used spare parts Part no Description Pcs Tech director sign Production director sign Finishing warranty management to be filled by warranty dept of NTC Returnin...

Page 22: ...Asphalt and concrete cutters Operation manual Page 22 issued 01 2017...

Reviews: