NSI NORK E Series Installation Instructions Download Page 2

Using the iAP to instAll A toRK mechAnicAl timeR 

to An inteRmAtic enclosURe

STEP 1

 

The original insulator that came with the timer must 

be replaced by the insulator provided with the IAP 

kit. For smaller metal enclosure, cut along the hori-

zontal line (1 1/4”) and for Pool and Spa panels  

(1 7/8”) from bottom of the insulator provided with 

the IAP kit. For all other enclosures, install the un-

modified insulator.

STEP 2

Attach the IAP to the mechanical timer.

Lift the motor wires and carefully insert the plate 

between the wires and the timer. Using the short 

screws, attach the IAP.

Using a flat-blade screwdriver, carefully tighten the 

screws to secure the timer to the IAP.

When correctly attached, the raised edge of the IAP 

should be on the LEFT side of the mechanical timer 

when viewed from the rear.

STEP 3

Slide the timer on an angle inside of the enclosure, 

gently resting it against the clip.

STEP 4

With the top of the IAP resting on the clip, push the 

top of the timer down until it snaps and locks.

®

®

A DIVISION OF

                        

NSi INDUSTRIES, LLC  

FOR TECHNICAL ASSISTANCE: 877.230.7874 •  WWW.NSIINDUSTRIES.COM

L1-201 (D)

Reviews: