
O p e r a t i o n a n d M a i n t e n a n c e
90
Sliding Rotator Wreckers – Operation and Maintenance
Models: CSR50 - CSR65 - CSR85
REV. 0
SEPTEMBER 19, 2022
4. Disconnect the MultiFaster hydraulic coupler that connects the underlift to the tag axle
and place it in the docking bracket on the side of the underlift. Additionally, disconnect
the electrical cable and three air hoses.
FIGURE 34 — PLACING THE CABLES AND HOSES IN THE DOCKING BRACKET
(EXAMPLE)
5. Restart the engine or engage the PTO.
6. Slightly raise the boom to relieve the pressure on the pins securing the tag axle assembly
to the wrecker tag axle rails. Remove the pins and store them.
7. Slightly extend or retract the boom so the tag axle's centre of gravity allows the tag axle
to slide freely in the rails. Using the boom, lift the tag axle close to the end of the rails and
ensure that it is still centred in the rails by slightly extending or retracting the boom.
8. Using the boom, slowly lift the tag axle out of the rails.