LINEA J3 /
LINE J3
10
Page 1: ...ED GE LINEA EDGE...
Page 2: ...QUIER RESIDUO BEFORE CONNECTING THE FAUCET TO THE WATER SUPPLY FLUSH THE TUBING THOROUGHLY TO ELIMINATE ANY RESIDUE CONGRATULATIONS THIS PRODUCT HAS BEEN SUBJECTED TO STRINGENT TESTS FOR ITS QUALITY P...
Page 3: ...ilter container Manguera flexible de 500 500 mm Flexible hose Manguera flexible de 500 mm 500 mm Flexible hose Arandela plastica Plastic washer Lluvia bide Cupla Nut Manguera flexible de 600 600 mm Fl...
Page 4: ...57 50 42 R 70 34 min 36 max 36 40 5 15 50 MEDIDAS MEASURES 3 LINEA J3 LINE J3 FR295 J3 FR295 J3D Juego bid Bidet faucet 40 64 5 264 5 MIN 41 MAX 55...
Page 5: ...2 1 4 3 INSTALACION INSTALLATION LINEA J3 LINE J3 Instalaci n del volante Handle installation 4...
Page 6: ...7 8 5 6 INSTALACION INSTALLATION LINEA J3 LINE J3 Instalaci n de volante transferencia Diverter handle installation 5...
Page 7: ...11 10 9 INSTALACION INSTALLATION LINEA J3 LINE J3 Instalaci n de la lluvia bid Spray installation 6...
Page 8: ...12 INSTALACION INSTALLATION LINEA J3 LINE J3 Instalaci n de la sopapa Drain installation 7 13 14...
Page 9: ...Instalaci n finalizada Finished installation LINEA J3 LINE J3 8...
Page 10: ...9...
Page 11: ...LINEA J3 LINE J3 10...
Page 12: ...FOLLFR295 J3 EDITION N 2 _ OCTUBRE 2014 LINEA J3 LINE J3 novum fvsa com...