NOVUM BUZZ FR217/J8.0 Installation Manual Download Page 6

CALIBRACIÓN / 

CALIBRATION

5

 LINEA J8 / 

LINE J8

Calibración de temperatura de la válvula termostática:

.La válvula termostática viene calibrada de fábrica para funcionar a la temperatura correcta, sin

embargo, hay circunstancias como el flujo de agua y las diferencias de presión entre el lado frío y 

caliente de las tuberías que pueden causar una diferencia de temperatura en el agua.

Para compensar estas diferencias tendrá que hacer las siguientes correcciones.

Temperature calibration of the thermostatic valve

*The Valve comes calibrated from the factory to function at the correct temperature, however there are
circumstances such as water flow and pressure differences between the hot and cold side of the pipes that

may cause a temperature differences in the water.

To compensate these differences you will need to make the following corrections.

4

3

5

6

Abrir el flujo de agua

Open

 water flow

Asegurar la posición 
cerrada de la válvula

 

/ Make sure valve

closed position

!

38º

Girar el inserto hexagonal hasta que la
temperatura llegue a 38ºC

Turn the stem until temperature reaches 100ºF

Remover el tornillo y el inserto 
hexagonal

Remove screw and hexagonal insert

Alinear una cara del inserto 
hexagonal con el limitador de temperatura

Place and align HexagonalInsert with temperature
limiter

Summary of Contents for BUZZ FR217/J8.0

Page 1: ...BU ZZ LINEA BUZZ FR217 J8 0 38 Solo apto para uso con termotanque...

Page 2: ...CUALQUIER RESIDUO BEFORE CONNECTING THE FAUCET TO THE WATER SUPPLY FLUSH THE TUBING THOROUGHLY TO ELIMINATE ANY RESIDUE CONGRATULATIONS THIS PRODUCT HAS BEEN SUBJECTED TO STRINGENT TESTS FOR ITS QUAL...

Page 3: ...do Allen wrench Buje roscado LINEA J8 LINE J8 DESPIECE EXPLODED VIEW FR217 J8 0 Kit Termost tico Thermostatic Kit 2 Screw Cap Handle Threaded bushing Allen wrench Cover Installation protection Thermos...

Page 4: ...3 140 90 51 10 50 54 LINEA J8 LINE J8 FR217 J8 0 Kit Termost tico Thermostatic Kit MEDIDAS MEASURES 58 51 32 7 43...

Page 5: ...CALIBRACI N CALIBRATION 4 LINEA J8 LINE J8 Remover la protecci n de instalaci n Remove installation covers 1 2 Volver a colocar el tornillo Place the screw back...

Page 6: ...actory to function at the correct temperature however there are circumstances such as water flow and pressure differences between the hot and cold side of the pipes that may cause a temperature differ...

Page 7: ...INSTALACI N INSTALLATION Instalaci n vista termost tica Thermostatic trim installation 6 LINEA J8 LINE J8 2 1 38 38 4 Bot n limitador de temperatura 3 Temperature limit button...

Page 8: ...NCTION LINEA J8 LINE J8 Funcionamiento del termostato Termostatic Trim function FUNCIONAMIENTO FUNCTION LINEA J8 LINE J8 Funcionamiento del termostato Termostatic Trim function Hot 4 Cold Hot Cold Cal...

Page 9: ...8 LINEA J8 LINE J8 1 Cortar al ras de la pared Cut flush with the wall 4 2 3 Instalaci n llave de paso Volume control installation INSTALACI N INSTALLATION...

Page 10: ...9 LINEA J8 LINE J8 5 6 7 8 Instalaci n vista de llave de paso Volume control trim installation INSTALACI N INSTALLATION...

Page 11: ...10 LINEA J8 LINE J8 9 10 INSTALACI N INSTALLATION...

Page 12: ...11 LINEA J8 LINE J8 Instalaci n finalizada Finished installation 38 INSTALACI N INSTALLATION...

Page 13: ...12...

Page 14: ...13...

Page 15: ...LINEA J8 LINE J8 15...

Page 16: ...FOLLFR217 J8 0 MARZO 2015 novum fvsa com LINEA J8 LINE J8 Web novum fvsa com...

Reviews: